Denver Legistar banner



File #: 17-0337    Version: 1
Type: Resolution Status: Adopted
File created: 3/13/2017 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 4/10/2017 Final action: 4/10/2017
Title: A resolution approving a proposed Contract between the City and County of Denver and W. L. Contractors, Inc., for the Mill Levy 8A & 8B traffic signal upgrade. Approves a contract with W.L. Contractors, Inc. for $1,178,904.74 and for eight months for the replacement and upgrade of traffic signals at the intersections of Kalamath Street and 7th Avenue, Southbound Speer Boulevard and Market Street, Lincoln Street and 8th Avenue, and Lincoln Street and 14th Avenue, including the removal and replacement of existing signal equipment, signage, ADA compliant pedestrian ramps, curb and gutter, and upgraded sidewalks in Council Districts 3, 9, and 10 (201732595). The last regularly scheduled Council meeting within the 30-day review period is on 5-1-17. The Committee approved filing this resolution by consent on 3-21-17.
Indexes: Zach Rothmier
Attachments: 1. RR17 0337 PW WL Contractors Request, 2. RR17 0337 PW WL Contractors Terms, 3. 17-0337 Filed Resolution_W.L. Contractors, Inc., 201732595-00, 4. 17-0337 Contract _W.L. Contractors, Inc., 201732595-00, 5. 17-0337 - signed.pdf
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 03-13-17

Requesting Agency: Public Works
Division:

* Name: Angela Casias
* Phone: 720.913.8529
* Email: angela.casias@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and W. L. Contractors, Inc., for the Mill Levy 8A & 8B traffic signal upgrade.
Approves a contract with W.L. Contractors, Inc. for $1,178,904.74 and for eight months for the replacement and upgrade of traffic signals at the intersections of Kalamath Street and 7th Avenue, Southbound Speer Boulevard and Market Street, Lincoln Street and 8th Avenue, and Lincoln Street and 14th Avenue, including the removal and replacement of existing signal equipment, signage, ADA compliant pedestrian ramps, curb and gutter, and upgraded sidewalks in Council Districts 3, 9, and 10 (201732595). The last regularly scheduled Council meeting within the 30-day review period is on 5-1-17. The Committee approved filing this resolution by consent on 3-21-17.
body

Affected Council District(s) or citywide? Council Districts 3, 9 and 10

Contract Control Number: 201732595

Vendor/Contractor Name (including any "DBA"): W.L. Contractors, Inc

Type and Scope of services to be performed: Reconstruct and upgrade five (5) existing traffic signals within the City and County of Denver (City). The signals are located at the following intersections: Kalamath/7th Ave, SB Speer/Market/Auraria, NB Speer/Market/Auraria, Lincoln/8th ...

Click here for full text