File #: 18-1264    Version: 1
Type: Resolution Status: Adopted
File created: 10/29/2018 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 11/19/2018 Final action: 11/19/2018
Title: A resolution approving a proposed Contract between the City and County and Denver with Mark Young Construction, Inc. for seating, stabilization, repairs, and other work at Red Rocks. Approves a contract with Mark Young Construction, Inc. for $2,625,765 and for six months for seating, stabilization, repairs and other work for the Red Rocks Subsurface project at Red Rocks Park (201844069). The last regularly scheduled Council meeting within the 30-day review period is on 12-10-18. The Committee approved filing this item at its meeting on 11-6-18.
Indexes: Zach Rothmier
Attachments: 1. RR18 1264 PW Mark Young Construction, 2. 18-1264_Filed Resolution_Mark Young Construction.201844069-00, 3. 18-1264_Contract_Mark Young Cons Inc.201844069-00, 4. 18-1264 Filed Resolution_Mark Young Construction.201844069-00.pdf, 5. 18-1264 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 10-30-18

 

Requesting Agency: Public Works

                               Division:

 

Subject Matter Expert Name:

Name:               Sarah Stanek

Email:         sarah.stanek@denvergov.org                                                               

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County and Denver with Mark Young Construction, Inc. for seating, stabilization, repairs, and other work at Red Rocks.

Approves a contract with Mark Young Construction, Inc. for $2,625,765 and for six months for seating, stabilization, repairs and other work for the Red Rocks Subsurface project at Red Rocks Park (201844069). The last regularly scheduled Council meeting within the 30-day review period is on 12-10-18. The Committee approved filing this item at its meeting on 11-6-18.

body

 

Affected Council District(s) or citywide?

 

Contract Control Number: 201844069

 

Vendor/Contractor Name (including any “DBA”): Mark Young Construction Inc

 

Type and Scope of services to be performed:

The project includes the demolition and reconstruction of seats 1-20 in rows 1-18 of the amphitheatre. This will include new micro piles under the reconstructed seating areas to provide stabilization. The project also includes rebuilding the north and pulpit plaza gutters as well as installing new retaining walls and vegetation in those areas. Repairs to the South stair and row 69 are included. New stone facade will also be placed on the existing retaining walls down to the Visitor's Center driveway.

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

4% W/MBE

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

Competitive

For New contracts

Term of initial contract: six months

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $2,625,765

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)