Denver Legistar banner



File #: 19-0066    Version: 1
Type: Resolution Status: Adopted
File created: 1/22/2019 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 3/18/2019 Final action: 3/18/2019
Title: A resolution approving a proposed Contract and Agreement between the City and County of Denver and Spectrum General Contractors, Inc. for Phase 3 of the Sullivan Gateway rehabilitation project. Approves a contract with Spectrum General Contractors for $1,907,325.44 and through 11-15-19 for construction renovation services as part of the Sullivan Gateway East project, including terracotta masonry restoration, repair and rehabilitation of fabricated terracotta panels and of art concrete sculptures at the top of terracotta columns, and other services, located at Colfax Avenue and Elizabeth Street in Council District 9 (201946720). The last regularly scheduled Council meeting within the 30-day review period is on 4-8-19. The Committee approved filing this item at its meeting on 1-29-19.
Indexes: Zach Rothmier
Attachments: 1. RR19 0066 PW Spectrum.pdf, 2. 19-0066 Filed Resolution_Spectrum General Contractors_201946720-00, 3. 19-0066 Contract and Agreement_Spectrum General Contractors, Inc._201946720-00, 4. 19-0066 Filed Resolution_Spectrum General Contractors_201946720-00.pdf, 5. 19-0066 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 1-22-19

 

Requesting Agency: Public Works

                               Division:

 

Subject Matter Expert Name:

Name:           Jason Gallardo                    

Email:        jason.gallardo@denvergov.org           

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract and Agreement between the City and County of Denver and Spectrum General Contractors, Inc. for Phase 3 of the Sullivan Gateway rehabilitation project.

Approves a contract with Spectrum General Contractors for $1,907,325.44 and through 11-15-19 for construction renovation services as part of the Sullivan Gateway East project, including terracotta masonry restoration, repair and rehabilitation of fabricated terracotta panels and of art concrete sculptures at the top of terracotta columns, and other services, located at Colfax Avenue and Elizabeth Street in Council District 9 (201946720). The last regularly scheduled Council meeting within the 30-day review period is on 4-8-19. The Committee approved filing this item at its meeting on 1-29-19.

body

 

Affected Council District(s) or citywide? CD 9

 

Contract Control Number: 201946720

 

Vendor/Contractor Name (including any “DBA”): Spectrum General Contractors

 

Type and Scope of services to be performed: Project includes terracotta masonry restoration including repair of existing material and fabrication and install of newly fabricated terracotta panels, repair and rehabilitation of art concrete sculptures at the top of terracotta columns and replacement of historic terracotta urns and benches; stabilization services to the brick core; re-grading at the base of wall; installation of Sta-Lok paving at base of wall; landscape restoration; anti-graffiti coating; repair, restoration and replacement of wrought iron arch; Lighting and electrical.

 

 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

                     

For New contracts

Term of initial contract: 3-1-19 - 11-15-19

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $1,907,325.44

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)