File #: 19-0224    Version: 1
Type: Resolution Status: Adopted
File created: 3/4/2019 In control: Business, Arts, Workforce, Climate & Aviation Services Committee
On agenda: 3/26/2019 Final action: 3/26/2019
Title: A resolution approving a proposed Agreement between the City and County of Denver and Intermountain Electric Inc. concerning maintenance of the electrical switchgears at Denver International Airport. Approves a contract with Intermountain Electric Inc. for $760,000 and for four years for timely and scheduled testing and preventative maintenance of the electrical switchgears at Denver International Airport (201842074). The last regularly scheduled Council meeting within the 30-day review period is on 4-15-19. The Committee approved filing this item at its meeting on 3-13-19.
Indexes: Jonathan Griffin
Attachments: 1. RR19 0224 DIA Intermountain Electric Inc Ordidance Request.pdf, 2. 19-0224 Contract_Intermountain Electric Inc., 3. 19-0224 Filed Resolution Intermountain Electric Inc., 4. 19-0224_Filed Resolution Intermountain Electric Inc.pdf, 5. 19-0224 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 3-5-19

 

Requesting Agency: Denver International Airport

                               Division:

 

Subject Matter Expert Name:

Name:   Angela Casias                                                 

Email:   Angela.Casias@flydenver.com                             

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Agreement between the City and County of Denver and Intermountain Electric Inc. concerning maintenance of the electrical switchgears at Denver International Airport.

Approves a contract with Intermountain Electric Inc. for $760,000 and for four years for timely and scheduled testing and preventative maintenance of the electrical switchgears at Denver International Airport (201842074). The last regularly scheduled Council meeting within the 30-day review period is on 4-15-19. The Committee approved filing this item at its meeting on 3-13-19.

body

 

Affected Council District(s) or citywide?

 

Contract Control Number: 201842074

 

Vendor/Contractor Name (including any “DBA”): Intermountain Electric Inc

 

Type and Scope of services to be performed:

The purpose of this project is to utilize the economic and operational benefits resulting from an effectively executed preventive maintenance and testing program of essential DEN electric power equipment.  The electric power distribution system at DEN has a large number of 480-volt switchgears and some 4160-volt switchgears.  This project will include the testing and preventive maintenance of these switchgears and related equipment as determined by the Project Manager.  The project will also address and fund high-priority (emergency) equipment and system issues (repair and replacement) in the DEN electric power distribution system.

 

 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source? Competitive

                     

For New contracts

Term of initial contract: four years

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $760,000.00

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)