Contract Request Template (Contracts; IGAs; Leases)
Date Submitted: 1-13-20
Requesting Agency: Department of Transportation and Infrastructure
Division:
Subject Matter Expert Name:
Name: Jason Gallardo |
Email: jason.gallardo@denvergov.org |
Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).
Both the title and description must be entered between the red “title” and “body” below. Do not at any time delete the red “title” or “body” markers from this template.
title
A resolution approving a proposed Agreement between the City and County of Denver and Sturgeon Electric Company, Inc. for the installation of a new traffic signal at East Yale Avenue and East Yale Circle.
Approves a contract with Sturgeon Electric Company, Inc. for $528,676.50 and for 150 days for the installation of a new traffic signal at East Yale Avenue and East Yale Circle, including an approximately 95' long concrete median, rebuilt curb ramp, and pavement work in Council District 4 (201952606). The last regularly scheduled Council meeting within the 30-day review period is on 4-27-20. The Committee approved filing this item at its meeting on 1-21-20.
body
Affected Council District(s) or citywide? Council District 4
Contract Control Number: 201952606
Vendor/Contractor Name (including any “DBA”): Sturgeon Electric Company, Inc.
Type and Scope of services to be performed:
This project includes the installation of a new traffic signal at E Yale Ave and E Yale Circle, an approximately 95' long concrete median, rebuilt curb ramp (removal of existing and installation of realigned new), full-depth patching of asphalt pavement, milling of asphalt pavement, an overlay of asphalt paving, and associated signing and striping.
Location (if applicable):
WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):
15%
Are WBE/MBE/DBE goals met (if applicable)?
Is the contract new/a renewal/extension or amendment?
Was this contractor selected by competitive process or sole source?
Competitive process
For New contracts
Term of initial contract: NTP +150 days
Options for Renewal:
How many renewals (i.e. up to 2 renewals)?
Term of any renewals (i.e. 1 year each):
Cost of initial contract term: $528,676.50
Cost of any renewals:
Total contract value council is approving if all renewals exercised:
For Amendments/Renewals Extensions:
Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?
If length changing
What was the length of the term of the original contract?
What is the length of the extension/renewal?
What is the revised total term of the contract?
If cost changing
What was the original value of the entire contract prior to this proposed change?
What is the value of the proposed change?
What is the new/revised total value including change?
If terms changing
Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)