File #: 20-0230    Version: 1
Type: Resolution Status: Adopted
File created: 3/2/2020 In control: Business, Arts, Workforce, Climate & Aviation Services Committee
On agenda: 3/23/2020 Final action: 3/23/2020
Title: A resolution approving a proposed Contract between the City and County of Denver and Flatiron Constructors, Inc. concerning removal and replacement of deteriorated concrete slabs for Runway 17R-35L and upgrading the airfield lighting system at Denver International Airport. Approves a contract with Flatiron Constructors, Inc. for $25,707,336.91 and 150 days for the construction of the Runway 17R-35L Complex Pavement Rehabilitation, Package 2 project, including the removal and replacement of deteriorated concrete slabs and upgrading the airfield lighting system at Denver International Airport (PLANE-201952248). The last regularly scheduled Council meeting within the 30-day review period is on 4-13-20. The Committee approved filing this item at its meeting on 3-11-20.
Indexes: Zach Rothmier
Attachments: 1. RR20 0230 DIA Flatiron Constructors Inc, 2. 20-0230 Filed Resolution_Flatiron Constructors Inc, 3. 20-0230 Contract_Flatiron Constructors Inc, 4. 20-0230 Filed Resolution_Flatiron Constructors Inc, 5. 20-0230 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 3-2-20

Requesting Agency: Denver International Airport
Division:

Subject Matter Expert Name:

Name: Angela Casias
Email: Angela.Casias@flydenver.com

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Flatiron Constructors, Inc. concerning removal and replacement of deteriorated concrete slabs for Runway 17R-35L and upgrading the airfield lighting system at Denver International Airport.
Approves a contract with Flatiron Constructors, Inc. for $25,707,336.91 and 150 days for the construction of the Runway 17R-35L Complex Pavement Rehabilitation, Package 2 project, including the removal and replacement of deteriorated concrete slabs and upgrading the airfield lighting system at Denver International Airport (PLANE-201952248). The last regularly scheduled Council meeting within the 30-day review period is on 4-13-20. The Committee approved filing this item at its meeting on 3-11-20.
body

Affected Council District(s) or citywide? Council District 11

Contract Control Number: PLANE-201952248

Vendor/Contractor Name (including any "DBA"): Flatiron Constructors, Inc.

Type and Scope of services to be performed:
This project will remove and replace deteriorated Portland Cement Concrete Pavement (PCCP) slabs on Taxiway M and L, abeam Runw...