File #: 21-0344    Version: 1
Type: Resolution Status: Adopted
File created: 3/22/2021 In control: Business, Arts, Workforce, Climate & Aviation Services Committee
On agenda: 4/12/2021 Final action: 4/12/2021
Title: A resolution approving a proposed Contract between the City and County of Denver and IHC Scott, Inc. concerning the rehabilitation of the Runway 16L-34R and Taxiway Z complex at Denver International Airport. Approves a contract with IHC Scott, Inc. for $23,555,608.22 and for 140 days for the rehabilitation of the Runway 16L-34R and Taxiway Z complex, which will remove and replace deteriorated concrete pavement and upgrade the airfield lighting system at Denver International Airport (202056997). The last regularly scheduled Council meeting within the 30-day review period is on 5-3-21. The Committee approved filing this item at its meeting on 3-31-21.
Indexes: John Mahoney
Attachments: 1. RR21 0344 DIA IHC Scott, Inc., 2. 21-0344 Filed Resolution_IHC Scott Inc., 3. 21-0344 Contract_IHC Scott, Inc., 4. 21-0344 Filed Resolution_IHC Scott Inc., 5. 21-0344 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 3-22-21

Requesting Agency: Denver International Airport
Division:

Subject Matter Expert Name:

Name: Angela Casias
Email: Angela.Casias@flydenver.com

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and IHC Scott, Inc. concerning the rehabilitation of the Runway 16L-34R and Taxiway Z complex at Denver International Airport.
Approves a contract with IHC Scott, Inc. for $23,555,608.22 and for 140 days for the rehabilitation of the Runway 16L-34R and Taxiway Z complex, which will remove and replace deteriorated concrete pavement and upgrade the airfield lighting system at Denver International Airport (202056997). The last regularly scheduled Council meeting within the 30-day review period is on 5-3-21. The Committee approved filing this item at its meeting on 3-31-21.
body

Affected Council District(s) or citywide? Council District 11

Contract Control Number: 202056997

Vendor/Contractor Name (including any "DBA"): IHC Scott, Inc.

Type and Scope of services to be performed:
This project will remove and replace deteriorated concrete pavement, joint sealant, and improve deficient taxiway safety areas on the Runway 16L-34R and Taxiway Z complex. The airfield lighting system will be upgraded with new LED fixtures, transformer, cables, and guidance signs. In addition, the project will refresh the surface painted pavement markings, and address surface drainage and slope...