File #: 21-0415    Version: 1
Type: Resolution Status: Adopted
File created: 4/7/2021 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 5/3/2021 Final action: 5/3/2021
Title: A resolution approving a proposed Contract between the City and County of Denver and Silva Construction, Inc. for the 2021 concrete panel replacement program for curb ramps, curbs, and gutters, citywide. Approves a contract with Silva Construction, Inc. for $885,190 and for 120 days for the 2021 concrete panel replacement program for curb ramps, curbs, and gutters, citywide (202057319). The last regularly scheduled Council meeting within the 30-day review period is on 2-24-21. The Committee approved filing this item at its meeting on 4-20-21.
Indexes: Zach Rothmier
Attachments: 1. RR21 0415 DOTI Silva Construction, 2. 21-0415 Contract_Silva Construction, Inc. 202057319, 3. 21-0415 Filed Resolution_Silva Construction, Inc. 202057319, 4. 21-0415 Filed Resolution_Silva Construction, Inc., 5. 21-0415 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 4-7-21

Requesting Agency: Department of Transportation and Infrastructure
Division:

Subject Matter Expert Name:

Name: Jason Gallardo
Email: jason.gallardo@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Silva Construction, Inc. for the 2021 concrete panel replacement program for curb ramps, curbs, and gutters, citywide.
Approves a contract with Silva Construction, Inc. for $885,190 and for 120 days for the 2021 concrete panel replacement program for curb ramps, curbs, and gutters, citywide (202057319). The last regularly scheduled Council meeting within the 30-day review period is on 2-24-21. The Committee approved filing this item at its meeting on 4-20-21.
body

Affected Council District(s) or citywide? Citywide

Contract Control Number: 202057319

Vendor/Contractor Name (including any "DBA"): Silva Construction, Inc.

Type and Scope of services to be performed:
2021 panel replacement through out the city where concrete failures have occurred. Curb ramps, curbs and gutters will be replaced as necessary.
Location (if applicable):

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):
100% SBE
Are WBE/MBE/DBE goals met (if applicable)?

Is the contract new/a renewal/extension or amendment?

Was this contractor selected by competitive process or sole ...