Denver Legistar banner



File #: 18-0904    Version: 1
Type: Resolution Status: Adopted
File created: 8/13/2018 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 9/10/2018 Final action: 9/10/2018
Title: A resolution approving a proposed Contract between the City and County of Denver and Iron Woman Construction & Environmental Services, LLC to improve drainage conditions to the Coors Field parking lot. Approves a contract with Iron Woman Construction & Environmental Services, LLC for $7,090,623 and for eight months to complete phase one of the 27th Street Storm Interceptor project to improve drainage conditions near 27th Street and Blake Street in Council District 9 (201841827). The last regularly scheduled Council meeting within the 30-day review period is on 9-24-18. The Committee approved filing this item at its meeting on 8-21-18.
Indexes: Zach Rothmier
Attachments: 1. RR18 0904 PW Iron Woman Construction, 2. 18-0904_Filed Resolution_Iron Woman Construction.201841827-00, 3. 18-0904_Iron Woman 27th Street Storm Contract.201841827-00, 4. 18-0904 Filed Resolution_Iron Woman Construction.201841827-00.pdf, 5. 18-0904 - signed.pdf

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 8-14-18

 

Requesting Agency: Public Works

                               Division:

 

Subject Matter Expert:

Name:     Sarah Stanek                                                                 

Email:       sarah.stanek@denvergov.org                                                                

 

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Iron Woman Construction & Environmental Services, LLC to improve drainage conditions to the Coors Field parking lot.

Approves a contract with Iron Woman Construction & Environmental Services, LLC for $7,090,623 and for eight months to complete phase one of the 27th Street Storm Interceptor project to improve drainage conditions near 27th Street and Blake Street in Council District 9 (201841827). The last regularly scheduled Council meeting within the 30-day review period is on 9-24-18.  The Committee approved filing this item at its meeting on 8-21-18.

body

 

Affected Council District(s) or citywide? Council District 9

 

Contract Control Number: 201841827

 

Vendor/Contractor Name (including any “DBA”): Iron Woman Construction & Environmental Services, LLC

 

Type and Scope of services to be performed:

The 27th Street Interceptor Project will improve drainage conditions in Basin 0062-1 by utilizing an existing 108" diameter storm system approximately 200' west of the 27th St. and Blake St. intersection in the Coors Field Parking lot. Phase 1 extends from the 108" southeast to 27th and Arapahoe. Construction includes open cut and tunneling of large diameter storm sewer and its associated facilities.

 

Location (if applicable): approximately 200' west of the 27th St. and Blake St. intersection in the Coors Field Parking lot. Phase 1 extends from the 108" southeast to 27th and Arapahoe.

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

15% M/WBE

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

Competitive

For New contracts

Term of initial contract: Eight months

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $7,090,623

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)