Contract Request Template (Contracts; IGAs; Leases)
Date Submitted: 7-19-21
Requesting Agency: Department of Transportation and Infrastructure
Division:
Subject Matter Expert Name:
Name: Jason Gallardo |
Email: jason.gallardo@denvergov.org |
Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).
Both the title and description must be entered between the red “title” and “body” below. Do not at any time delete the red “title” or “body” markers from this template.
title
A bill for an ordinance approving a proposed Agreement between the City and County of Denver and Urban Drainage and Flood Control District D/B/A Mile High Flood Control District, for construction of drainage and flood control improvements for Marston Lakes North at Bowles Ditch.
Approves an intergovernmental agreement with Urban Drainage and Flood Control District (UDFCD), doing business as Mile High Flood Control District, for $1,250,000 of UDFCD funds and $1,250,000 of City funds and through 8-1-24 for construction of drainage and flood control improvements for Marston Lakes North at Bowles Ditch in Council District 2 (202159332). The last regularly scheduled Council meeting within the 30-day review period is on 8-30-21. The Committee approved filing this item at its meeting on 7-27-21.
body
Affected Council District(s) or citywide? Council District 2
Contract Control Number: 202159332
Vendor/Contractor Name (including any “DBA”): Urban Drainage and Flood Control District (UDFCD), doing business as Mile High Flood Control District
Type and Scope of services to be performed:
Agreement No. 21-05.14: This agreement will commit an additional $1,250,000 in Mile High Flood District (UDFCD) funds, and $1,250,000 in Wastewater Enterprise funds for the Marston Lakes North at Bowles Ditch Project to construct drainage and flood control improvements for a total of $2,500,000. The improvements will include drainage improvements for Marston Lake North at Bowles Ditch in southwest Denver. This project is being managed through design by the MHFD (UDFCD) and will be constructed by CCD. The city shall be reimbursed the MHFD funds after construction.
Location (if applicable):
WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):
Are WBE/MBE/DBE goals met (if applicable)?
Is the contract new/a renewal/extension or amendment?
Was this contractor selected by competitive process or sole source?
For New contracts
Term of initial contract: Execution - 8/1/2024
Options for Renewal:
How many renewals (i.e. up to 2 renewals)?
Term of any renewals (i.e. 1 year each):
Cost of initial contract term: $2,500,000.00
Cost of any renewals:
Total contract value council is approving if all renewals exercised:
For Amendments/Renewals Extensions:
Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?
If length changing
What was the length of the term of the original contract?
What is the length of the extension/renewal?
What is the revised total term of the contract?
If cost changing
What was the original value of the entire contract prior to this proposed change?
What is the value of the proposed change?
What is the new/revised total value including change?
If terms changing
Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)