Denver Legistar banner



File #: 23-1388    Version: 1
Type: Resolution Status: Adopted
File created: 9/27/2023 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 10/23/2023 Final action: 10/23/2023
Title: A resolution approving a proposed Amendatory Agreement between the City and County of Denver and Michael Baker International, Inc. to continue providing general civil/roadway design, bridge inspection, traffic engineering, and wastewater planning and design professional services, citywide. Amends an on-call contract with Michael Baker International, Inc., by adding $2,600,000 for a new total of $12,000,000 and two years for a new ending date of 1-14-2026 to continue providing general civil/roadway design, bridge inspection, traffic engineering, and wastewater planning and design professional services, citywide (DOTI-202369361-01/DOTI-202056614-01). The last regularly scheduled Council meeting within the 30-day review period is on 11-13-2023. The Committee approved filing this item at its meeting on 10-10-2023.
Indexes: Lucas Palmisano
Attachments: 1. RR23-1388_DOTI-202369361 Michael Baker Ordinance Request, 2. 23-1388 Filed Resolution_Michael Baker International, Inc. 202369361-01, 3. 23-1388 Amendatory Agreement_Michael Baker Intl 202369361-01, 4. 23-1388 Filed Resolution_Michael Baker International, Inc., 5. 23-1388_signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 10-09-2023

 

Requesting Agency: Transportation & Infrastructure

                               Division:

 

Subject Matter Expert Name: Kristen Moore
Email Address:
Kristen.moore@denvergov.org <mailto:Kristen.moore@denvergov.org>
Phone Number:

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Amendatory Agreement between the City and County of Denver and Michael Baker International, Inc. to continue providing general civil/roadway design, bridge inspection, traffic engineering, and wastewater planning and design professional services, citywide.

Amends an on-call contract with Michael Baker International, Inc., by adding $2,600,000 for a new total of $12,000,000 and two years for a new ending date of 1-14-2026 to continue providing general civil/roadway design, bridge inspection, traffic engineering, and wastewater planning and design professional services, citywide (DOTI-202369361-01/DOTI-202056614-01). The last regularly scheduled Council meeting within the 30-day review period is on 11-13-2023. The Committee approved filing this item at its meeting on 10-10-2023.

body

 

Affected Council District(s) or citywide?

Citywide

 

Contract Control Number:

DOTI-202369361-01/DOTI-202056614-01

 

Vendor/Contractor Name (including any “DBA”):

Michael Baker International, Inc.

 

Type and Scope of services to be performed:

1.                     General Civil/Roadway Design (20% MWBE): Work in this category is related to the design of larger, multi-disciplinary civil and/or roadway widening or reconstruction projects.  Multi-disciplinary projects will contain several significant scope elements that prevent the use of a specific category.  Significant sidewalk design projects will be included in this category.  Tasks and deliverables to support civil/roadway design are included.

                     Design for multi-disciplinary projects.  Could include roadway/intersection, drainage, traffic, bridges, underpasses, etc.

                     Design for roadway improvement projects

                     Design for significant sidewalk improvement projects with Right of Way impacts or other major site constraints

                     Design for median improvements

                     Design for ADA compliance

                     Plan, specification and cost estimate preparation

                     Construction support

3                     Bridge Inspection (20% MWBE): Work in this category is related to the inspection of existing roadway and pedestrian bridges, culverts, retaining walls and occasional special structures.  Tasks include cyclical, routine inspections as well as special or emergency inspections.  Equipment and software necessary to collect and provide the data are included in the work.  Bridge designs will be addressed in another category.

                     Field data collection for structural inspections

                     Report preparation for structural inspections (containing EI and SI&A information, past ratings, sketches, and other pertinent documentation)

                     Delivering data in excel format that can be uploaded into CCD asset management system

                     Non-destructive testing techniques

                     Scour analysis and report

                     Load ratings

                     Identification of essential repair findings (per the CDOT inspection manual)

 

7                     Traffic Engineering (25% MWBE): Work in this category is related to the design of new and replacement traffic signal infrastructure, associated intersection improvements, and traffic studies.  Designs related specifically to traffic control, signing, and striping are also included in this category.  Tasks and deliverables to support traffic engineering are included.

                     Signal design and timing (including signal work orders)

                     Corridor retiming design

                     Signing and striping

                     Traffic analysis/modeling

                     Traffic data collection

                     Preparation of traffic impact and warrant studies

                     Traffic control design/construction phasing plans

                     Design for ADA compliance

                     Construction support, including shop drawing review

                     Plan, specification and cost estimate preparation

12                     Wastewater Planning and Design (20% MWBE): Work in this category is related to the planning and design for storm, sanitary, waterway and water quality systems.  These systems will include small neighborhood systems, and large, complex, multi-discipline focus basin systems within confined urban corridors.  The work may also include providing construction support.  Tasks and deliverables to support wastewater planning and design are included.

                     Storm and sanitary master planning

                     Storm and sanitary design

                     Water quality planning and design

                     Hydraulic and hydrologic planning and design

                     Plan, specification, and cost estimate preparation

                     Project management

                     Construction support

 

 

 

Location (if applicable):

 

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

WMBE

 

Are WBE/MBE/DBE goals met (if applicable)?

Category 1: 20%, Category 3: 20%, Category 7: 25%, Category 12: 20%

 

Category 1: ACL, Alta Planning + Design, Communication Infrastructure Group, Clanton & Associates, ERO Resources Corporation, Geocal, HCL Engineering & Surveying, Linda Wilson Group, Livable Cities Studio, OV Consulting, Pinyon Environmental, Shannon & Wilson, Shrewsberry & Associates, SurvWest, Triunity, Transportation Resource Services

Category 3: IDAX Data Solutions, KDG Engineering, CONSOR Engineers, Terracon Consultants, Triunity, Bridge Diagnostics, ERO Resources Corporation, Geocal

Category 7: Peters and Yaffee, Triunity, Navjoy Consulting Services, IDAX Data Solutions, Alta Planning + Design, Transportation Resource Services, Shrewsberry & Associates, Shannon & Wilson, HCL Engineering & Surveying, Pinyon Environmental, ERO Resources Corporation, Communication Infrastructure Group, Linda Wilson Group, Clanton & Associates

Category 12: Atkins North America, Dig Studio, DHM Design, Pinyon Environmental, ERO Resources Corporation, SurvWest, HCL Engineering & Surveying, OV Consulting, Triunity, Geocal, Shannon & Wilson, Lithos Engineering, Shrewsberry & Associates, Clanton & Associates

 

Is the contract new/a renewal/extension or amendment?

Amendment

 

Was this contractor selected by competitive process or sole source?

Competitive source

                     

For New contracts

Term of initial contract:

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term:

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

Cost & length of term

If length changing

What was the length of the term of the original contract?

1/15/2021-1/14/2024

 

What is the length of the extension/renewal?

24 months

 

What is the revised total term of the contract?

1/15/2021-1/14/2026

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

$9,400,000

 

What is the value of the proposed change?

$2,600,000

 

What is the new/revised total value including change?

$12,0-00,000

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)