Contract Request Template (Contracts; IGAs; Leases)
Date Submitted: 6-19-2023
Requesting Agency:Department of Transportation & Infrastructure
Division:
Subject Matter Expert Name: Gabrielle Schuller
Email Address: gabrielle.schuller@denvergov.org <mailto:gabrielle.schuller@denvergov.org>
Phone Number:
Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).
Both the title and description must be entered between the red “title” and “body” below. Do not at any time delete the red “title” or “body” markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Halcyon Construction, Inc. for construction services at municipal buildings, citywide.
Approves an on-call contract with Halcyon Construction, Inc., for $5,000,000 and 3 years for construction services at municipal buildings, citywide (DOTI-202367858). The last regularly scheduled Council meeting within the 30-day review period is on 7-24-2023. The Committee approved filing this item at its meeting on 6-20-2023.
body
Affected Council District(s) or citywide?
Citywide
Contract Control Number:
DOTI-202367858
Vendor/Contractor Name (including any “DBA”):
Halcyon Construction, Inc.
Type and Scope of services to be performed:
The goal of the On-Call master contract is to procure multiple Small Business Enterprise (SBE) On-Call construction services contracts to establish a new group of qualified SBE On-Call general contractors to respond to proposal requests with bidding and execution of construction work on municipal building projects. Scopes may consist of a roof replacement, mechanical upgrades (HVAC controls), lighting retrofit, concrete/asphalt replacement, or other. On- Call SBE general contractors will be requested to mini bid projects against other On- Call SBE General Contractors to ensure the City is receiving the best value. The City desires to award multiple On-Call SBE construction services contracts, each with a maximum contract limit of $5,000,000.00 for the three-year duration.
Location (if applicable):
WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):
SBE
Are WBE/MBE/DBE goals met (if applicable)?
SBE 30%
SBE Self-performed
Is the contract new/a renewal/extension or amendment?
NEW
Was this contractor selected by competitive process or sole source?
Competitive process
For New contracts
Term of initial contract:
NPT + 3 years
Options for Renewal:
How many renewals (i.e. up to 2 renewals)?
Term of any renewals (i.e. 1 year each):
Cost of initial contract term:
$5,000,000
Cost of any renewals:
Total contract value council is approving if all renewals exercised:
For Amendments/Renewals Extensions:
Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?
If length changing
What was the length of the term of the original contract?
What is the length of the extension/renewal?
What is the revised total term of the contract?
If cost changing
What was the original value of the entire contract prior to this proposed change?
What is the value of the proposed change?
What is the new/revised total value including change?
If terms changing
Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)