File #: 17-1027    Version: 1
Type: Resolution Status: Adopted
File created: 9/12/2017 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 10/9/2017 Final action: 10/9/2017
Title: A resolution approving a proposed Contract between the City and County of Denver and Myers and Sons Construction, LP related to the Platte River and Goldsmith Gulch Rehabilitations project. Approves a contract with Myers and Sons Construction, LP for $1,588,659.14 and for five months to rehabilitate three bridge structures related to the Goldsmith Gulch and Platte River Rehabilitation projects, including concrete spall and delamination repair, asphalt overlay, and railing work located at the Goldsmith Gulch at South Monaco Parkway and at East Eastman Avenue, and over the South Platte River at Mississippi Avenue in Council Districts 4, 6, and 7 (201735788). The last regularly scheduled Council meeting within the 30-day review period is on 10-30-17. The Committee approved filing this resolution by consent on 9-19-17.
Indexes: Zach Rothmier
Attachments: 1. RR17 1027 PW Myers & Sons Request, 2. RR17 1027 PW Myers & Sons Terms, 3. 17-1027 Filed Resolution_Myers and Sons Construction, LP 201715788-00, 4. 17-1027 Contract_Myers and Sons Construction, LP 201735788-00, 5. 17-1027 Filed Resolution_Myers and Sons Construction, LP 201715788-00.pdf, 6. 17-1027 - signed.pdf

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 09-12-17

 

Requesting Agency: Public Works

                               Division:

 

§                     Name:                     Angela Casias

§                     Phone:                     720-913-8529

§                     Email:                     Angela.casias@denvergov.org

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Myers and Sons Construction, LP related to the Platte River and Goldsmith Gulch Rehabilitations project.

Approves a contract with Myers and Sons Construction, LP for $1,588,659.14 and for five months to rehabilitate three bridge structures related to the Goldsmith Gulch and Platte River Rehabilitation projects, including concrete spall and delamination repair, asphalt overlay, and railing work located at the Goldsmith Gulch at South Monaco Parkway and at East Eastman Avenue, and over the South Platte River at Mississippi Avenue in Council Districts 4, 6, and 7 (201735788).  The last regularly scheduled Council meeting within the 30-day review period is on 10-30-17.  The Committee approved filing this resolution by consent on 9-19-17.  

body

 

Affected Council District(s) or citywide? Council Districts 4, 6, and 7

 

Contract Control Number: 201735788

 

Vendor/Contractor Name (including any “DBA”): Myers and Sons Construction, LP

 

Type and Scope of services to be performed:

Project bid package to include 2 sets of plans for 3 structures to be rehabilitated.  Project Schedule "A" is PWT2015-056 and includes 2 structures located on Goldsmith Gulch, 1 at Monaco (D-11-GG-080), and the other at Eastman (D-11-GG-130).  This includes routine repairs such as concrete spall and delamination repair, asphalt overlay, and railings.  Project Schedule "B" is PWT2015-055 and includes rehabilitation of the Mississippi over Platte River Bridge (D-02-PR-220), curb ramp restoration, substructure repairs, and adjustment of a traffic signal pull box.

 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

                     

For New contracts

Term of initial contract: Five months

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $1,588,659.14

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)