Denver Legistar banner



File #: 23-0070    Version: 1
Type: Resolution Status: Adopted
File created: 1/17/2023 In control: Business, Arts, Workforce, Climate & Aviation Services Committee
On agenda: 2/13/2023 Final action: 2/13/2023
Title: A resolution approving a proposed Contract between the City and County of Denver and Mythograph, Inc., concerning designing, fabricating and installing public artwork located in Concourse B-West expansion at Denver International Airport. Approves a contract with Mythograph, Inc. for $2,500,000 and three years, plus two 1-year options to extend, to design, fabricate and install a sculpture, as part of the city's public art program, located in Concourse B-West expansion at Denver International Airport in Council District 11 (PLANE- 202264226). The last regularly scheduled Council meeting within the 30-day review period is on 3-6-2023. The Committee approved filing this item at its meeting on 2-1-2023.
Indexes: Anne Wallace
Attachments: 1. RR23-0070_DEN Ordinance Resolution Request - Kipp Kobayashi - Concourse B-West, 2. RR23-0070_DEN City Council Summary Memo - Concourse B-West, Kipp Kobayashi, 3. DEN Concourse Expansion Art - Presentation, 4. 23-0070 Contract - Mythograph, Inc..pdf, 5. 23-0070 Filed Resolution_Mythograph Inc. - 202264226.pdf, 6. 23-0070 Filed Resolution_Mythograph Inc., 7. 23-0070 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 1-30-2023

 

Requesting Agency: Denver International Airport

                               Division:

 

Subject Matter Expert Name: Stacey Stegman
Email Address: Stacey.Stegman@denvergov.org
Phone Number:

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Mythograph, Inc., concerning designing, fabricating and installing public artwork located in Concourse B-West expansion at Denver International Airport.

Approves a contract with Mythograph, Inc. for $2,500,000 and three years, plus two 1-year options to extend, to design, fabricate and install a sculpture, as part of the city’s public art program, located in Concourse B-West expansion at Denver International Airport in Council District 11 (PLANE- 202264226). The last regularly scheduled Council meeting within the 30-day review period is on 3-6-2023. The Committee approved filing this item at its meeting on 2-1-2023.

body

 

Affected Council District(s) or citywide? 11

 

Contract Control Number: PLANE- 202264226

 

Vendor/Contractor Name (including any “DBA”):  Mythograph, Inc.

 

Type and Scope of services to be performed:

 

Artist Kipp Kobayashi of Claremont, CA, will create a suspended artwork to be placed within the circulation space of the newly constructed Concourse B-West expansion at DEN. The artwork will be created from stainless-steel welded mesh titled, The Cosmology of Flight. The sculpture will be approx. 140’L x 25’W x 20’H. The artwork which is inspired by scale, perception and size will activate the center circulation space of the newly constructed Concourse B-West expansion with a life-size 767 aircraft. The translucent sculpture will allow passengers the uncommon view an airplane up-close to appreciate the modern marvel of air travel.

Scope of work:

1.                     Artist shall perform all services and furnish all supplies, materials, and equipment as necessary for the conception and design of the artwork, including but not limited to, payments for all necessary taxes, permits, insurance, small tools, any subconsultants, rental equipment, and all other items incidental to producing a complete and acceptable artwork.

2.                     The work includes all design of the complete artwork including but not limited to associated foundations, mounting brackets or devices, electronic components, video components and all other miscellaneous components necessary to complete the fabrication and installation of the artwork.

3.                     Artist shall determine the artistic expression, scope, design, color, size, material and texture of the Work, subject to review and acceptance by the City/ Denver International Airport as defined by the selected concept.

4.                     Artist shall provide a plaque at the designed site, according to the specifications set forth by DEN Arts. Plaque specifications will be determined during the Final Design phase.

5.                     Artist shall be responsible for the payment of all storage, transportation or shipping of the artwork to the site.

6.                     The Artist shall, if applicable, comply with all the City and County of Denver Department of Transportation and Infrastructure, Standard Specifications for Construction (“Yellow Book”) and permitting or engineering requirements of Denver International Airport.

7.                     Upon final acceptance and completion of the artwork, the artist will appear for a public appearance and final dedication event.

 

Location (if applicable): DEN

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts): N/A

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

New

Was this contractor selected by competitive process or sole source?

Competitive                      

For New contracts

Term of initial contract:

3 years

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)? 2

                     Term of any renewals (i.e. 1 year each): 1-year

 

Cost of initial contract term:

$2.5M

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)