Contract Request Template (Contracts; IGAs; Leases)
Date Submitted: 6-05-2023
Requesting Agency: Parks & Recreation
Division:
Subject Matter Expert Name: Jeff Prink
Email Address: jeff.prink@denvergov.org
Phone Number:
Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).
Both the title and description must be entered between the red “title” and “body” below. Do not at any time delete the red “title” or “body” markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Valerian L.L.C. for irrigation master planning consulting services including design, assessments, water supply conversion, public engagement, and outreach, citywide.
Approves an on-call contract with Valerian LLC for $750,000 and 3 years for irrigation master planning consulting services including design, assessments, water supply conversion, public engagement, and outreach, citywide (PARKS-202367584). The last regularly scheduled Council meeting within the 30-day review period is on 7-10-2023. The Committee approved filing this item at its meeting on 6-6-2023.
body
Affected Council District(s) or citywide?
Citywide
Contract Control Number:
PARKS-202367584
Vendor/Contractor Name (including any “DBA”):
Valerian LLC
Type and Scope of services to be performed:
The On-Call Irrigation Design Service contract will be utilized for the assessment of existing park irrigation assets. Design documents for repair, renovation, or replacement of existing park irrigation assets. Design documents for improvements and upgrades to existing irrigation assets. System-wide planning and park-specific irrigation master planning efforts (individual park master plans, system-wide assessment reports, asset-specific planning, public engagement, and outreach. Water supply infrastructure including ditch work, pump station facilities, and other delivery infrastructure; and conversion from potable to reclaimed or raw water supply.
Location (if applicable):
WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts): N/A
Are WBE/MBE/DBE goals met (if applicable)?
Is the contract new/a renewal/extension or amendment?
New
Was this contractor selected by competitive process or sole source?
Competitive process
For New contracts
Term of initial contract: Effective date + 3 years
Options for Renewal:
How many renewals (i.e. up to 2 renewals)?
Term of any renewals (i.e. 1 year each):
Cost of initial contract term:
$750,000
Cost of any renewals:
Total contract value council is approving if all renewals exercised:
For Amendments/Renewals Extensions:
Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?
If length changing
What was the length of the term of the original contract?
What is the length of the extension/renewal?
What is the revised total term of the contract?
If cost changing
What was the original value of the entire contract prior to this proposed change?
What is the value of the proposed change?
What is the new/revised total value including change?
If terms changing
Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)