File #: 23-0691    Version: 1
Type: Resolution Status: Adopted
File created: 5/23/2023 In control: Business, Arts, Workforce, Climate & Aviation Services Committee
On agenda: 6/12/2023 Final action: 6/12/2023
Title: A resolution approving a proposed Contract between the City and County of Denver and Flatiron Constructors, Inc. concerning construction services to rehabilitate various assets at gates C40 and C42 at Denver International Airport. Approves a contract with Flatiron Constructor, Inc. for $8,445,671 and 120 days for construction services to rehabilitate various assets at gates C40 and C42 at Denver International Airport in Council District 11 (PLANE-202265787). The last regularly scheduled Council meeting within the 30-day review period is on 6-26-2023. The Committee approved filing this item at its meeting on 5-31-2023.
Indexes: Melissa Mata
Attachments: 1. RR23-0691_DEN Resolution Request - Gates C40 and C42 Rehabilitation Project 202265787, 2. 23-0691 Contract_Flatiron Constructor, Inc. - 202265787, 3. 23-0691 Filed Resolution_Flatiron Constructor Inc, 4. 23-0691 Filed Resolution_Flatiron Constructor Inc, 5. 23-0691 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 5-29-2023

 

Requesting Agency: Denver International Airport

                               Division:

 

Subject Matter Expert Name: Brandon Gainey
Email Address: brandon.gainey@flydenver.com
Phone Number:

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Flatiron Constructors, Inc. concerning construction services to rehabilitate various assets at gates C40 and C42 at Denver International Airport.

Approves a contract with Flatiron Constructor, Inc. for $8,445,671 and 120 days for construction services to rehabilitate various assets at gates C40 and C42 at Denver International Airport in Council District 11 (PLANE-202265787). The last regularly scheduled Council meeting within the 30-day review period is on 6-26-2023. The Committee approved filing this item at its meeting on 5-31-2023.

body

 

Affected Council District(s) or citywide?

Council District 11

 

Contract Control Number:

PLANE-202265787

 

Vendor/Contractor Name (including any “DBA”):

Flatiron Constructors, Inc.

 

Type and Scope of services to be performed:

Construction services for the Gates C40 & C42 Rehabilitation Project at Denver International Airport (DEN). This project is a continuation of the DEN Gate Apron Drainage and Rehabilitation Improvements (GARDI) Program. The scope of work will include demolition and rehabilitation of existing apron pavement and select underground utilities to improve the pavement condition and drainage condition. Additionally, there are numerous DEN Project Requests that will be addressed with this phase of the GARDI Program. By fixing existing heaving pavement issues, this project will significantly improve the gate apron drainage condition. As a result, the existing problem of flooding at interior concourse apron-level spaces will be addressed. Additionally, existing non-compliance issues of electrical components associated with Lift Station #11 will be corrected. Furthermore, existing sanitary sewer overflows occurring in the area will be corrected with the installation of new sanitary sewer infrastructure. Lastly, other rehabilitation efforts to the apron parking positions are included with the project scope including new potable water cabinets, new storm drain and sanitary structures, and other miscellaneous utility improvements. The project will be closely coordinated with DEN Stakeholders during construction to minimize operational impacts during construction.

 

 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):  W/MBE

 

Are WBE/MBE/DBE goals met (if applicable)?

16.09%

Tom Calabrese Trucking, Inc.

Vine Laboratories, Inc.

Allstate Sweeping Inc.

Ram-CO Trucking Services

Construction Supply Services, LLC

Smittick Electric

JM Bangert, Inc.

American Sign Company

 

Is the contract new/a renewal/extension or amendment? 

New

 

Was this contractor selected by competitive process or sole source?

Competitive process

                     

For New contracts

Term of initial contract:  NTP + 120 days

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term:

$8,445,671

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)