File #: 21-0364    Version: 1
Type: Resolution Status: Adopted
File created: 3/25/2021 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 4/19/2021 Final action: 4/19/2021
Title: A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. for ADA construction and repairs to the concrete curb ramps, curb, gutters, sidewalks, concrete street panels and alley pavement, citywide. Approves a contract with Keene Concrete, Inc. for $2,764,845 and for 300 days for ADA construction and repairs to the concrete curb ramps, curb, gutters, sidewalks, concrete street panels and alley pavement, citywide (202057327). The last regularly scheduled Council meeting within the 30-day review period is on 5-10-21. The Committee approved filing this item at its meeting on 4-6-21.
Indexes: Zach Rothmier
Attachments: 1. RR21 0364 DOTI Keene Concrete Inc., 2. 21-0364 Contract_Keene Concrete Inc 202057327, 3. 21-0364 Filed Resolution_Keene Concrete, Inc. 202057327, 4. 21-0364 Filed Resolution_Keene Concrete, Inc., 5. 21-0364 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 3-25-21

 

Requesting Agency: Department of Transportation and Infrastructure

                               Division:

 

Subject Matter Expert Name:

Name:        Jason Gallardo                    

Email:        jason.gallardo@denvergov.org           

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. for ADA construction and repairs to the concrete curb ramps, curb, gutters, sidewalks, concrete street panels and alley pavement, citywide.

Approves a contract with Keene Concrete, Inc. for $2,764,845 and for 300 days for ADA construction and repairs to the concrete curb ramps, curb, gutters, sidewalks, concrete street panels and alley pavement, citywide (202057327). The last regularly scheduled Council meeting within the 30-day review period is on 5-10-21. The Committee approved filing this item at its meeting on 4-6-21.

body

 

Affected Council District(s) or citywide? Citywide

 

Contract Control Number: 202057327

 

Vendor/Contractor Name (including any “DBA”): Keene Concrete, Inc.

 

Type and Scope of services to be performed:

2021 Citywide ADA construction alongside repairs to the concrete curb, gutters, sidewalks, valley pans, concrete street panels and alley pavement.

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

30%

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

Competitive process                     

For New contracts

Term of initial contract: NTP+300 days

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $2,764,845.00

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)