Denver Legistar banner



File #: 20-1068    Version: 1
Type: Resolution Status: Adopted
File created: 9/28/2020 In control: Business, Arts, Workforce, Climate & Aviation Services Committee
On agenda: 10/20/2020 Final action: 10/20/2020
Title: A resolution approving a proposed First Amendment between the City and County of Denver and Hensel Phelps Construction Co. concerning the Emergency Fuel Shut-off System at Denver International Airport. Amends a contract with Hensel Phelps Construction Co. by adding $800,000 for a new total of $5,713,939.01 for the replacement of the Emergency Fuel Shut-off System at Denver International Airport. No change to contract duration (202055473). The last regularly scheduled Council meeting within the 30-day review period is on 11-9-20. The Committee approved filing this item at its meeting on 10-7-20.
Indexes: John Mahoney
Attachments: 1. RR20 1068 DIA Hensel Phelps EFSO, 2. 20-1068 Filed Resolution_Hensel Phelps Construction, 3. 20-1068 Contract_Hensel Phelps Construction Co., 4. 20-1068 Filed Resolution_Hensel Phelps Construction, 5. 20-1068 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 9-28-20

 

Requesting Agency: Denver International Airport

                               Division:

 

Subject Matter Expert Name:

Name:         Angela Casias                                                             

Email:         Angela.Casias@flydenver.com                                                              

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed First Amendment between the City and County of Denver and Hensel Phelps Construction Co. concerning the Emergency Fuel Shut-off System at Denver International Airport.

Amends a contract with Hensel Phelps Construction Co. by adding $800,000 for a new total of $5,713,939.01 for the replacement of the Emergency Fuel Shut-off System at Denver International Airport. No change to contract duration (202055473). The last regularly scheduled Council meeting within the 30-day review period is on 11-9-20. The Committee approved filing this item at its meeting on 10-7-20.

body

 

Affected Council District(s) or citywide? Council District 11

 

Contract Control Number: 202055473

 

Vendor/Contractor Name (including any “DBA”): Hensel Phelps Construction Co.

 

Type and Scope of services to be performed:

The scope of work for the emergency fuel shut-off (EFSO) project includes: phase replacement of existing EFSO Simplex pull-stations with new EFSO push-buttons with new signs at all concourse locations; provide new pressure transducers and wiring to control valves located in valve vaults; reconnect new EFSO system on new multimode fiber for long distance; replace Concourse A commuter loading rack A-1 concrete slab and curb and repair fiber communication to equipment; repair conduits per investigation at all concourse locations and replace concrete apron panels to complete repairs.

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

13.05%

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

Competitive process                     

For New contracts

Term of initial contract:

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term:

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

$4,913,939.01

What is the value of the proposed change?

$800,000.00

What is the new/revised total value including change?

$5,713,939.01

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)