Contract Request Template (Contracts; IGAs; Leases)
Date Submitted: 12-04-20
Requesting Agency: Department of Transportation and Infrastructure
Division:
Subject Matter Expert Name:
Name: Jason Gallardo |
Email: jason.gallardo@denvergov.org |
Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).
Both the title and description must be entered between the red “title” and “body” below. Do not at any time delete the red “title” or “body” markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Ordonez and Vogelsang, LLC for on-call multimodal and transportation planning professional services, citywide.
Approves a contract with Ordonez and Vogelsang, LLC for $1.25 million and through 1-14-24 for on-call multimodal and transportation planning professional services, citywide (DOTI-202056618). The last regularly scheduled Council meeting within the 30-day review period is on 1-19-21. The Committee approved filing item at its meeting on 12-15-20.
body
Affected Council District(s) or citywide? Citywide
Contract Control Number: DOTI-202056618
Vendor/Contractor Name (including any “DBA”): Ordonez And Vogelsang, LLC
Type and Scope of services to be performed:
5. Multimodal and Transportation Planning (30% MWBE): Work in this category is related to planning for multimodal projects and general transportation efforts. Work will include large-scale, citywide planning efforts, network plans, corridor plans, location assessments and recommended improvements, systematic application plans, program implementation plans that include fiscal analysis, and next steps studies. Work will support pedestrian, bike, transit, freight, curbside management, parking, vision zero, congestion mitigation, corridor operations, smart cities, transportation demand management, safe routes to school, grant applications, adaptive streets, and strategic mobility efforts.
• Multimodal planning
o Existing conditions research
o Project assessments, conceptual design, and project scope definition
o Alternatives analysis
o Public involvement management
o Program evaluation and prioritization
o Development of assessment and analytic tools
o GIS analyzation
o Pedestrian/Bike/Transit/Parking/Vehicle counts
o Modeling/Traffic analysis
o Data collection and evaluation
o Determine vision/goals/measures
o Development of measures/metrics and reports
Location (if applicable):
WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):
30%
Are WBE/MBE/DBE goals met (if applicable)?
Is the contract new/a renewal/extension or amendment?
Was this contractor selected by competitive process or sole source?
Competitive process
For New contracts
Term of initial contract: 1/15/2021 - 1/14/2024
Options for Renewal:
How many renewals (i.e. up to 2 renewals)?
Term of any renewals (i.e. 1 year each):
Cost of initial contract term: $1,250,000.00
Cost of any renewals:
Total contract value council is approving if all renewals exercised:
For Amendments/Renewals Extensions:
Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?
If length changing
What was the length of the term of the original contract?
What is the length of the extension/renewal?
What is the revised total term of the contract?
If cost changing
What was the original value of the entire contract prior to this proposed change?
What is the value of the proposed change?
What is the new/revised total value including change?
If terms changing
Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)