Denver Legistar banner



File #: 23-1335    Version: 1
Type: Resolution Status: Adopted
File created: 9/21/2023 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 10/23/2023 Final action: 10/23/2023
Title: A resolution approving a proposed Amendatory Agreement between the City and County of Denver and AECOM Technical Services, Inc. to continue providing bridge design professional services, citywide. Amends an on-call contract with AECOM Technical Services, Inc., by adding $2,000,000 for a new total of $4,000,000 and two years for a new ending date of 1-14-2026 to continue providing bridge design professional services, citywide (DOTI-202369322-01/DOTI-202056565-01). The last regularly scheduled Council meeting within the 30-day review period is on 11-13-2023. The Committee approved filing this item at its meeting on 10-10-2023.
Indexes: Lucas Palmisano
Attachments: 1. RR23-1335_DOTI-202369322 AECOM Ordinance Request, 2. 23-1335 Filed Resolution_AECOM Technical Services, Inc. 202369322-01, 3. 23-1335 Amendatory Agreement_AECOM 202369322-01, 4. 23-1335 Filed Resolution_AECOM Technical Services, Inc., 5. 23-1335_signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 10-04-2023

 

Requesting Agency: Transportation & Infrastructure

                               Division:

 

Subject Matter Expert Name: Kristen Moore
Email Address:
Kristen.moore@denvergov.org <mailto:Kristen.moore@denvergov.org>
Phone Number:

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Amendatory Agreement between the City and County of Denver and AECOM Technical Services, Inc. to continue providing bridge design professional services, citywide.

Amends an on-call contract with AECOM Technical Services, Inc., by adding $2,000,000 for a new total of $4,000,000 and two years for a new ending date of 1-14-2026 to continue providing bridge design professional services, citywide (DOTI-202369322-01/DOTI-202056565-01). The last regularly scheduled Council meeting within the 30-day review period is on 11-13-2023. The Committee approved filing this item at its meeting on 10-10-2023.

body

 

Affected Council District(s) or citywide?

Citywide

 

Contract Control Number:

DOTI-202369322-01/DOTI-202056565-01).

 

Vendor/Contractor Name (including any “DBA”):

AECOM Technical Services, Inc.

 

Type and Scope of services to be performed:

Bridge Design (22% MWBE): Work in this category is related to the design of new bridges, bridge replacements, bridge rehabilitation, and bridge preservation projects.  Structural work may also include culverts or retaining walls.  Tasks and deliverables to support bridge design are included.  Standalone bridge inspections will be addressed in another category.

                     Structural design and plan development for bridge or wall replacements and rehabilitations

                     Structural analysis of new and existing bridges

                     Load ratings for vehicular bridges per CDOT requirements using AASHTO BrR Software

                     Provide a detailed review of work performed by other designers

                     Structure Selection Reports for vehicular bridges, pedestrian bridges and wall structures

                     Provide plans, specifications, quantities, and cost estimate preparation per CDOT requirements

                     Construction support, including shop drawing review, RFIs, and value engineering proposals

                     Structural consultation

 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

WMBE - Category 2:22%

 

Are WBE/MBE/DBE goals met (if applicable)?

22%   
Category 2: 105 West, Eugene Lynne, Geocal, Goodbee & Associates, HCL Engineering & Surveying, Peak Consulting Group, Pinyon Environmental, RockSol Consulting Group, San Engineering

 

Is the contract new/a renewal/extension or amendment?

Amendment

 

Was this contractor selected by competitive process or sole source?

                     RFQ 5-04-2020

 

For New contracts

Term of initial contract:

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term:

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

Cost & length of term

 

If length changing

What was the length of the term of the original contract?

1/15/2021-1/14-2024

 

 

What is the length of the extension/renewal?

24 months

 

What is the revised total term of the contract?

1/15/2021-1/14/2026

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

$2,000,000

 

What is the value of the proposed change?

$2,000,000

 

What is the new/revised total value including change?

$4,000,000

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)