File #: 23-0379    Version: 1
Type: Resolution Status: Adopted
File created: 4/3/2023 In control: Business, Arts, Workforce, Climate & Aviation Services Committee
On agenda: 4/24/2023 Final action: 4/24/2023
Title: A resolution approving a proposed Contract between the City and County of Denver and IHC Scott, Inc., concerning airfield construction, including repairs and improvements to pavement on taxiways, airfield lighting, and new drainage systems at Denver International Airport. Approves a contract with IHC Scott, Inc. for $ 4,161,905.20 and one hundred twenty-three (123) consecutive calendar days to support airfield construction, including repairs and improvements to pavement of taxiways, airfield lighting, and new drainage systems, located at Denver International Airport in Council District 11 (PLANE-202266065). The last regularly scheduled Council meeting within the 30-day review period is on 5-15-2023. The Committee approved filing this item at its meeting on 4-12-2023.
Indexes: Anne Wallace
Attachments: 1. RR-23-0379_DEN - Annual Airfield Pavement Rehab 202366065, 2. RR-23-0379_DEN - Annual Airfield Pavement Rehab City Council Summary - 202366065, 3. 23-0379 Contract_IHC Scott, 4. 23-0379 Filed Resolution_IHC Scott, 5. 23-0379 Filed Resolution_IHC Scott, 6. 23-0379 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 4-10-2023

 

Requesting Agency: Denver International Airport

                               Division:

 

Subject Matter Expert Name: Brandon Gainey
Email Address: Brandon.Gainey@flydenver.com
Phone Number:

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and IHC Scott, Inc., concerning airfield construction, including repairs and improvements to pavement on taxiways, airfield lighting, and new drainage systems at Denver International Airport.

Approves a contract with IHC Scott, Inc. for $ 4,161,905.20 and one hundred twenty-three (123) consecutive calendar days to support airfield construction, including repairs and improvements to pavement of taxiways, airfield lighting, and new drainage systems, located at Denver International Airport in Council District 11 (PLANE-202266065). The last regularly scheduled Council meeting within the 30-day review period is on 5-15-2023. The Committee approved filing this item at its meeting on 4-12-2023.

body

 

Affected Council District(s) or citywide? 11

 

Contract Control Number: PLANE-202266065

 

Vendor/Contractor Name (including any “DBA”): IHC Scott, Inc.

 

Type and Scope of services to be performed:

The 2023 Annual Airfield Pavement Rehabilitation contract will replace deteriorated pavement, and remove and reinstall airfield lighting, transformers, and cables at Denver International Airport. Additionally, the project will provide construction services to add drainage piping from building roof drains to trench drains and replace pavement markings and joint sealant as needed. This infrastructure is needed to improve the operational capacity and efficiency of the airport.

 

The 2023 Annual Airfield Pavement Rehabilitation project will replace deteriorated concrete pavement at taxiways Charlie Sierra and Mike, the apron at south cargo, improve any deficient taxiway safety areas, and upgrade the airfield lighting on taxiways Charlie Sierra and Mike within the construction site and the panels at Gate 1 on the airfield complex. Additionally, this project will refresh the surface painted pavement markings, add new lighting controls to runway complex 16L-34R and electrical power controls to gate 1, and replace the joint seal near the center core of concourses B and C. The project also adds new drainage from FED-EX down drains to the storm drain system.

 

Location (if applicable): DEN

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts): DBE

 

Are WBE/MBE/DBE goals met (if applicable)? The Division of Small Business Opportunity (DSBO) established a goal of 16% DBE participation. The selected bidder, IHC Scott Inc. has committed to 16.13% DBE participation.

 

Who are the subcontractors to this contract?

Airport Lighting Systems

American Sign Co.

American Construction Supplies

Astec

Calabrese Trucking, Inc.

Hot Shot Supply

Kolbe Striping

Ram-CO Trucking Services

Servitech, Inc.

 

Is the contract new/a renewal/extension or amendment?

New

Was this contractor selected by competitive process or sole source?

Competitive via IFB                     

For New contracts

Term of initial contract:

One Hundred Twenty-Three (123) consecutive calendar days from Notice to Proceed (NTP) date

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term:

$ 4,161,905.20

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)