File #: 20-0303    Version: 1
Type: Resolution Status: Adopted
File created: 3/20/2020 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 4/13/2020 Final action: 4/13/2020
Title: A resolution approving a proposed Contract between the City and County of Denver and Concrete Works of Colorado, Inc. for storm drainage project improvements extending along the Marion Street Corridor from Martin Luther King Junior Boulevard to East 27th Avenue. Approves a contract with Concrete Works of Colorado, Inc. for $8,717,325 and for 240 days for storm drainage project improvements extending along the Marion Street Corridor from Martin Luther King Junior Boulevard to East 27th Avenue in Council District 9 (201952435). The last regularly scheduled Council meeting within the 30-day review period is on 5-4-20. The Committee approved filing this item at its meeting on 3-31-20.
Indexes: Zach Rothmier
Attachments: 1. RR20 0303 DOTI Concrete Works of CO, 2. 20-0303 Contract Concrete Works of Colorado Inc. 201952435, 3. 20-0303 Filed Resolution_Concrete Works of Colorado, Inc. 201952435, 4. 20-0303 Filed Resolution_Concrete Works of Colorado, Inc., 5. 20-0303 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 3-20-20

 

Requesting Agency: Department of Transportation and Infrastructure

                               Division:

 

Subject Matter Expert Name:

Name:        Jason Gallardo                    

Email:        jason.gallardo@denvergov.org           

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Concrete Works of Colorado, Inc. for storm drainage project improvements extending along the Marion Street Corridor from Martin Luther King Junior Boulevard to East 27th Avenue.

Approves a contract with Concrete Works of Colorado, Inc. for $8,717,325 and for 240 days for storm drainage project improvements extending along the Marion Street Corridor from Martin Luther King Junior Boulevard to East 27th Avenue in Council District 9 (201952435). The last regularly scheduled Council meeting within the 30-day review period is on 5-4-20. The Committee approved filing this item at its meeting on 3-31-20.

body

 

Affected Council District(s) or citywide? Council District 9

 

Contract Control Number: 201952435

 

Vendor/Contractor Name (including any “DBA”): Concrete Works of Colorado, Inc.

 

Type and Scope of services to be performed:

This storm drainage project extending along Marion Street Corridor from MLK Blvd. to E. 27th Ave. (five city blocks) will connect the upstream end of the 33rd Street Outfall system at MLK Blvd. The majority of the work consists of open cut construction of 8' x 8' concrete boxes and relocation of a 6" waterline. Other areas of work include surface restoration in asphalt paving, in concrete sidewalks, and in curb ramps. Green infrastructure (Streetside Stormwater Planters) is also part of other areas of work to enhance water quality.

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

17.12%

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

Competitive process                     

For New contracts

Term of initial contract: NTP + 240 days

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $8,717,325.00

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)