Contract Request Template (Contracts; IGAs; Leases)
Date Submitted: 3-20-20
Requesting Agency: Department of Transportation and Infrastructure
Division:
Subject Matter Expert Name:
Name: Jason Gallardo |
Email: jason.gallardo@denvergov.org |
Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).
Both the title and description must be entered between the red “title” and “body” below. Do not at any time delete the red “title” or “body” markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Concrete Works of Colorado, Inc. for storm drainage project improvements extending along the Marion Street Corridor from Martin Luther King Junior Boulevard to East 27th Avenue.
Approves a contract with Concrete Works of Colorado, Inc. for $8,717,325 and for 240 days for storm drainage project improvements extending along the Marion Street Corridor from Martin Luther King Junior Boulevard to East 27th Avenue in Council District 9 (201952435). The last regularly scheduled Council meeting within the 30-day review period is on 5-4-20. The Committee approved filing this item at its meeting on 3-31-20.
body
Affected Council District(s) or citywide? Council District 9
Contract Control Number: 201952435
Vendor/Contractor Name (including any “DBA”): Concrete Works of Colorado, Inc.
Type and Scope of services to be performed:
This storm drainage project extending along Marion Street Corridor from MLK Blvd. to E. 27th Ave. (five city blocks) will connect the upstream end of the 33rd Street Outfall system at MLK Blvd. The majority of the work consists of open cut construction of 8' x 8' concrete boxes and relocation of a 6" waterline. Other areas of work include surface restoration in asphalt paving, in concrete sidewalks, and in curb ramps. Green infrastructure (Streetside Stormwater Planters) is also part of other areas of work to enhance water quality.
Location (if applicable):
WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):
17.12%
Are WBE/MBE/DBE goals met (if applicable)?
Is the contract new/a renewal/extension or amendment?
Was this contractor selected by competitive process or sole source?
Competitive process
For New contracts
Term of initial contract: NTP + 240 days
Options for Renewal:
How many renewals (i.e. up to 2 renewals)?
Term of any renewals (i.e. 1 year each):
Cost of initial contract term: $8,717,325.00
Cost of any renewals:
Total contract value council is approving if all renewals exercised:
For Amendments/Renewals Extensions:
Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?
If length changing
What was the length of the term of the original contract?
What is the length of the extension/renewal?
What is the revised total term of the contract?
If cost changing
What was the original value of the entire contract prior to this proposed change?
What is the value of the proposed change?
What is the new/revised total value including change?
If terms changing
Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)