Skip to main content
Denver Legistar banner



File #: 25-0370    Version: 1
Type: Resolution Status: Adopted
File created: 3/17/2025 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 4/7/2025 Final action: 4/7/2025
Title: A resolution approving a proposed Contract between the City and County of Denver and Silva Construction, Inc. for the annual removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration for 2025 Citywide ADA Ramp and Concrete Repair 3, citywide. Approves a contract with Silva Construction Inc., for $1,992,676.00 and NTP +200 days for the annual removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration for 2025 Citywide ADA Ramp and Concrete Repair 3, citywide (DOTI-202477465). The last regularly scheduled Council meeting within the 30-day review period is on 4-28-2025. The Committee approved filing this item at its meeting on 3-25-2025.
Indexes: Lucas Palmisano
Attachments: 1. RR25-0370_DOTI_202477465 Resolution Request Form, 2. 25-0370 Filed Resolution_Silva Construction Inc. 202477465-00, 3. 25-0370 Contract_Silva Construction Inc. 202477465-00, 4. 25-0370 Filed Resolution_Silva Construction Inc. 202477465-00.pdf, 5. 25-0370_Signed.pdf

Other/Miscellaneous Request Template (Appointments; ROW; Code Changes; Zoning Action, etc.)

 

Date Submitted: 03-24-2025

 

Requesting Agency: DOTI

                               Division:

 

Subject Matter Expert Name: Alaina McWhorter
Email Address: alaina.mcwhorter@denvergov.org
Phone Number:

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Silva Construction, Inc. for the annual removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration for 2025 Citywide ADA Ramp and Concrete Repair 3, citywide.

Approves a contract with Silva Construction Inc., for $1,992,676.00 and NTP +200 days for the annual removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration for 2025 Citywide ADA Ramp and Concrete Repair 3, citywide (DOTI-202477465). The last regularly scheduled Council meeting within the 30-day review period is on 4-28-2025. The Committee approved filing this item at its meeting on 3-25-2025.

body

 

Affected Council District(s) or citywide?

Citywide

Executive Summary with Rationale and Impact:

Detailed description of the item and why we are doing it. This can be a separate attachment.

 

Address/Location (if applicable):

 

Legal Description (if applicable):

 

Denver Revised Municipal Code (D.R.M.C.) Citation (if applicable):

 

Draft Bill Attached?