File #: 13-0953    Version: 1
Type: Bill Status: Passed
File created: 12/12/2013 In control: Consent
On agenda: 12/12/2013 Final action: 1/21/2014
Title: Amends the existing 31st and 36th St. Outfall Study and Design contract with Wilson & Company by adding $138,592.45 to the existing contract amount of $1,274,184 for a total of $1,412,776.45 for the final design of the Blake Street Lateral (CE 201101768). Amend the existing 31st and 36th St. Outfall Study and Design contract with Wilson & Company to include final design of the Blake Street Lateral. The Blake Street Lateral is a storm sewer that will tie into the 31st and 36th Street Outfall to provide drainage to the intersection of Blake and 31st. This intersection is historically prone to flooding and was not included in the original scope of work for the 31st and 36th Street Outfall. The design will include a storm sewer system from 31st and Blake to 33rd and Blake.
Attachments: 1. Bill Request, 2. BR13-0953. PW - blake street outfall amendment, 3. CB13-0953_Bill_WilsonCompany