File #: 18-0333    Version: 1
Type: Resolution Status: Adopted
File created: 3/27/2018 In control: Business, Arts, Workforce, & Aeronautical Services Committee
On agenda: 4/16/2018 Final action: 4/16/2018
Title: A resolution approving a proposed Agreement between the City and County of Denver and Flatiron Constructors, Inc. concerning the runway 7-25 complex lighting and pavement rehabilitation project at Denver International Airport. Approves a contract with Flatiron Constructors, Inc. for $15 million and for 14 months for the Runway 7-25 Complex Lighting and Pavement Rehabilitation project including replacing fixtures, transformers, cables, signs, and regulators, upgrading the existing passive pavement sensor system, installing drainage to several electrical manholes, and other services at Denver International Airport (201737338). The last regularly scheduled Council meeting within the 30-day review period is on 5-7-18. The Committee approved filing this resolution by consent on 4-4-18.
Indexes: Zach Rothmier
Attachments: 1. RR18 0333 DIA Flatiron, 2. 18-0333 Contract_Flatiron Constructors, 3. 18-0333 Filed Resolution_Flatiron Constructors, 4. 18-0333 Filed Resolution_Flatiron Constructors.pdf, 5. 18-0333 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 3-27-18

Requesting Agency: Denver International Airport
Division:

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Agreement between the City and County of Denver and Flatiron Constructors, Inc. concerning the runway 7-25 complex lighting and pavement rehabilitation project at Denver International Airport.
Approves a contract with Flatiron Constructors, Inc. for $15 million and for 14 months for the Runway 7-25 Complex Lighting and Pavement Rehabilitation project including replacing fixtures, transformers, cables, signs, and regulators, upgrading the existing passive pavement sensor system, installing drainage to several electrical manholes, and other services at Denver International Airport (201737338). The last regularly scheduled Council meeting within the 30-day review period is on 5-7-18. The Committee approved filing this resolution by consent on 4-4-18.
body

Affected Council District(s) or citywide? Council District 11

Contract Control Number: 201737338

Vendor/Contractor Name (including any "DBA"): Flatiron Constructors, Inc.,

Type and Scope of services to be performed:
This Contract is to rehabilitate the RW 7-25 Complex lighting system by removing and replacing fixtures, transformers, cables, signs, and regulators. Rehabilitate the Complex's pavement by removing and replacing deteriorated concrete slabs. Adjust utility structures. Refresh the pavement markings. The in-pavement fixtures and the airfield...