Title:
|
Approves a $2,703,229.10 contract with Felsburg Holt Ullevig, Inc., through 12-31-20 to complete the final design drawings, specifications, cost estimates, and construction bid documents for the second phase of the I-25 and Broadway interchange, which includes the new on-ramp to southbound Interstate 25, and reconstruction or modification to Ohio, Exposition, and Broadway in Council District 7 (201629558).
|