Denver Legistar banner



File #: 18-0011    Version: 1
Type: Resolution Status: Adopted
File created: 12/26/2017 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 1/2/2018 Final action: 1/29/2018
Title: A resolution approving a proposed Contract between the City and County of Denver and Ralph L. Wadsworth Construction Company, LLC related to the Sanderson Gulch Reach 1 Project. Approves a contract with Ralph L. Wadsworth Construction Company, LLC for $11,664,856.78 and for ten months for the Sanderson Gulch Reach 1 Project including channel grading, concrete flatwork, asphalt paving, utility relocations, riprap placement, loose and grouted slab stone boulder construction, and other services located along the Sanderson Gulch from South Platte River Drive to South Lipan Street in Council District 7 (201737381). The last regularly scheduled Council meeting within the 30-day review period is on 2-20-18. The Committee approved filing this resolution by consent on 1-2-18.
Indexes: Zach Rothmier
Attachments: 1. RR18 0011 PW Ralph L Wadsworth Construction Company Request, 2. RR18 0011 PW Ralph L Wadsworth Construction Company Terms, 3. 18-0011 Filed Resolution_Ralph L. Wadsworth Construction Company, LLC 201737381-00, 4. 18-0011 Contract_Ralph L. Wadsworth Construction Company, LLC 201737381-00 HardBid (Working Copy)_OPT, 5. 18-0011_Filed Resolution_Ralph L. Wadsworth Construction Company, LLC, 6. 18-0011 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 12-26-17

Requesting Agency: Public Works
Division:

? Name: Angela Casias
? Phone: 720-913-8529
? Email: angela.casias@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Ralph L. Wadsworth Construction Company, LLC related to the Sanderson Gulch Reach 1 Project.
Approves a contract with Ralph L. Wadsworth Construction Company, LLC for $11,664,856.78 and for ten months for the Sanderson Gulch Reach 1 Project including channel grading, concrete flatwork, asphalt paving, utility relocations, riprap placement, loose and grouted slab stone boulder construction, and other services located along the Sanderson Gulch from South Platte River Drive to South Lipan Street in Council District 7 (201737381). The last regularly scheduled Council meeting within the 30-day review period is on 2-20-18. The Committee approved filing this resolution by consent on 1-2-18.
body

Affected Council District(s) or citywide? Council District 7

Contract Control Number: 201737381

Vendor/Contractor Name (including any "DBA"): Ralph L. Wadsworth Construction Company, LLC

Type and Scope of services to be performed:
Sanderson Gulch Reach 1 project will improve the currently undersized drainage system from Lipan St to the confluence with the South Platte River. The improvements include a box culvert system from Lipan St to just downstream of the BNSF railroad and a combination ...

Click here for full text