File #: 20-0907    Version: 1
Type: Resolution Status: Adopted
File created: 8/31/2020 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 9/21/2020 Final action: 9/21/2020
Title: A resolution approving a proposed Third Amendatory Agreement between the City and County of Denver and HDR Engineering, Inc. for post-design services for the Iowa Underpass project in Council District 7. Amends a contract with HDR Engineering by adding $117,786.16 for a new total of $935,470.02 and 18 months for a new end date of 12-31-22 for revised project packaging and post-design services for the Iowa Underpass project located at South Santa Fe Boulevard and Iowa Street in Council District 7 (201737759; 202055745). The last regularly scheduled Council meeting within the 30-day review period is on 10-12-20. The Committee approved filing this item at its meeting on 9-8-20.
Indexes: Zach Rothmier
Attachments: 1. RR20 0907 DOTI HDR Engineering, 2. 20-0907 Filed Resolution_HDR Engineering, Inc. 202055745-03, 3. 20-0907 Third Amendatory Agreement_HDR Engineering 202055745-03, 4. 20-0907 Filed Resolution_HDR Engineering, Inc., 5. 20-0907 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 8-31-20

Requesting Agency: Department of Transportation and Infrastructure
Division:

Subject Matter Expert Name:

Name: Jason Gallardo
Email: jason.gallardo@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Third Amendatory Agreement between the City and County of Denver and HDR Engineering, Inc. for post-design services for the Iowa Underpass project in Council District 7.
Amends a contract with HDR Engineering by adding $117,786.16 for a new total of $935,470.02 and 18 months for a new end date of 12-31-22 for revised project packaging and post-design services for the Iowa Underpass project located at South Santa Fe Boulevard and Iowa Street in Council District 7 (201737759; 202055745). The last regularly scheduled Council meeting within the 30-day review period is on 10-12-20. The Committee approved filing this item at its meeting on 9-8-20.
body

Affected Council District(s) or citywide? Council District 7

Contract Control Number: 201737759 (Alfresco) 202055745 (Jaggaer)

Vendor/Contractor Name (including any "DBA"): HDR Engineering

Type and Scope of services to be performed:
In order to meet the DRCOG TIP grant requirements and to maximize the amount of the TIP grant, the project has been split into two separate construction packages. An adverse historic determination on the Iowa Underpass portion of the project would not have been ab...