Denver Legistar banner



File #: 19-0820    Version: 1
Type: Resolution Status: Adopted
File created: 8/9/2019 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 9/23/2019 Final action: 9/23/2019
Title: A resolution approving a proposed Contract between the City and County of Denver and Concrete Works of Colorado, Inc. for the construction of Phase 2 of the 27th Street Storm Interceptor project to improve drainage conditions. Approves a contract with Concrete Works of Colorado, Inc. for $5,135,998 and for 210 days for the construction of Phase 2 of the 27th Street Storm Interceptor project to improve drainage conditions in Basin 0062-1 located from 27th Street and Arapahoe Street southeast to 27th Street and California Street in Council District 9 (201950389). The last regularly scheduled Council meeting within the 30-day review period is on 10-14-19. The Committee approved filing this item at its meeting on 9-10-19.
Indexes: Zach Rothmier
Attachments: 1. RR19 0820 PW Concree Works of Coloardo, 2. 27thSt-LUTIPresentation_09-2019, 3. 19-0820 Filed Resolution_Concrete Works of Colorado, Inc._201950389-00, 4. 19-0820 Agreement_Concrete Works of Colorado, Inc._201950389, 5. 19-0820 Filed Resolution_Concrete Works of Colorado, Inc., 6. 19-0820 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 8-9-19

Requesting Agency: Public Works
Division:

Subject Matter Expert Name: Jason Gallardo
Email Address: jason.gallardo@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Concrete Works of Colorado, Inc. for the construction of Phase 2 of the 27th Street Storm Interceptor project to improve drainage conditions.
Approves a contract with Concrete Works of Colorado, Inc. for $5,135,998 and for 210 days for the construction of Phase 2 of the 27th Street Storm Interceptor project to improve drainage conditions in Basin 0062-1 located from 27th Street and Arapahoe Street southeast to 27th Street and California Street in Council District 9 (201950389). The last regularly scheduled Council meeting within the 30-day review period is on 10-14-19. The Committee approved filing this item at its meeting on 9-10-19.
body

Affected Council District(s) or citywide? Council District 9

Contract Control Number: 201950389

Vendor/Contractor Name (including any "DBA"): CONCRETE WORKS OF COLORADO, INC.

Type and Scope of services to be performed:
The 27th Street Interceptor Project will improve drainage conditions in Basin 0062-1 by utilizing an existing 108" diameter storm system approximately 200' west of the 27th St. and Blake St. intersection in the Coors Field Parking lot. Phase 2 extends from 27th and Arapahoe St southeast to 27th an...

Click here for full text