File #: 17-0337    Version: 1
Type: Resolution Status: Adopted
File created: 3/13/2017 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 4/10/2017 Final action: 4/10/2017
Title: A resolution approving a proposed Contract between the City and County of Denver and W. L. Contractors, Inc., for the Mill Levy 8A & 8B traffic signal upgrade. Approves a contract with W.L. Contractors, Inc. for $1,178,904.74 and for eight months for the replacement and upgrade of traffic signals at the intersections of Kalamath Street and 7th Avenue, Southbound Speer Boulevard and Market Street, Lincoln Street and 8th Avenue, and Lincoln Street and 14th Avenue, including the removal and replacement of existing signal equipment, signage, ADA compliant pedestrian ramps, curb and gutter, and upgraded sidewalks in Council Districts 3, 9, and 10 (201732595). The last regularly scheduled Council meeting within the 30-day review period is on 5-1-17. The Committee approved filing this resolution by consent on 3-21-17.
Indexes: Zach Rothmier
Attachments: 1. RR17 0337 PW WL Contractors Request, 2. RR17 0337 PW WL Contractors Terms, 3. 17-0337 Filed Resolution_W.L. Contractors, Inc., 201732595-00, 4. 17-0337 Contract _W.L. Contractors, Inc., 201732595-00, 5. 17-0337 - signed.pdf

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 03-13-17

 

Requesting Agency: Public Works

                               Division:

 

§                     Name:                     Angela Casias

§                     Phone:                     720.913.8529

§                     Email:                     angela.casias@denvergov.org

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and W. L. Contractors, Inc., for the Mill Levy 8A & 8B traffic signal upgrade.

Approves a contract with W.L. Contractors, Inc. for $1,178,904.74 and for eight months for the replacement and upgrade of traffic signals at the intersections of Kalamath Street and 7th Avenue, Southbound Speer Boulevard and Market Street, Lincoln Street and 8th Avenue, and Lincoln Street and 14th Avenue, including the removal and replacement of existing signal equipment, signage, ADA compliant pedestrian ramps, curb and gutter, and upgraded sidewalks in Council Districts 3, 9, and 10 (201732595).  The last regularly scheduled Council meeting within the 30-day review period is on 5-1-17. The Committee approved filing this resolution by consent on 3-21-17.

body

 

Affected Council District(s) or citywide? Council Districts 3, 9 and 10

 

Contract Control Number: 201732595

 

Vendor/Contractor Name (including any “DBA”): W.L. Contractors, Inc

 

Type and Scope of services to be performed: Reconstruct and upgrade five (5) existing traffic signals within the City and County of Denver (City). The signals are located at the following intersections: Kalamath/7th Ave, SB Speer/Market/Auraria, NB Speer/Market/Auraria, Lincoln/8th Ave, and Lincoln/14th Ave. The overall scope of this project will be to remove the existing traffic signal equipment at each location - poles, signal and pedestrian indications, and associated equipment - and replace with new traffic signal equipment in accordance with City standards. This work will install new poles and mastarms, overhead indication heads, pedestrian signal heads, and vehicle detection. It will also replace all existing signage. ADA compliant pedestrian ramps, curb and gutter, and sidewalks will also be upgraded at all locations to meet City standards. Intersection striping will also be refreshed with new pedestrian crosswalks and stop bars in accordance with City standards.

 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts): 15% W/MBE

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

                     

For New contracts

Term of initial contract: 240 days from Notice to Proceed

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $1,178,904.74

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)