Denver Legistar banner



File #: 17-0349    Version: 1
Type: Resolution Status: Adopted
File created: 3/13/2017 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 4/24/2017 Final action: 4/24/2017
Title: A resolution approving a proposed Contract between the City and County of Denver and Concrete Works of Colorado, Inc. to improve drainage and construct a storm sewer system along the 33rd Street corridor. Approves a one-year $6,556,720 contract with Concrete Works of Colorado, Inc. to improve the drainage conditions in the Lower Platte Valley and 36th and Downing Basins during a 5-year storm event, a phase of the 33rd Street outfall project to construct the storm sewer system and its associated facilities along the 33rd Street corridor starting at Blake Street and ending at Arapahoe Street in Council District 9 (201631819). The last regularly scheduled Council meeting within the 30-day review period is on 5-15-17. The Committee approved filing this resolution by consent on 3-21-17.
Indexes: Zach Rothmier
Attachments: 1. RR17 0349 PW 33rd St Outfall Plan, 2. RR17 0349 PW 33rd St Outfall Request, 3. RR17 0349 PW 33rd St Outfall Terms, 4. 17-0349 Filed Resolution_Concrete Works.201631819-00, 5. 17-0349 HardBid_Concrete Works.201631819-00.pdf, 6. 17-0349 - signed.pdf
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 03-14-17

Requesting Agency: Public Works
Division:

* Name: Angela Casias
* Phone: 720 913 8529
* Email: angela.casias@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Concrete Works of Colorado, Inc. to improve drainage and construct a storm sewer system along the 33rd Street corridor.
Approves a one-year $6,556,720 contract with Concrete Works of Colorado, Inc. to improve the drainage conditions in the Lower Platte Valley and 36th and Downing Basins during a 5-year storm event, a phase of the 33rd Street outfall project to construct the storm sewer system and its associated facilities along the 33rd Street corridor starting at Blake Street and ending at Arapahoe Street in Council District 9 (201631819). The last regularly scheduled Council meeting within the 30-day review period is on 5-15-17. The Committee approved filing this resolution by consent on 3-21-17.
body

Affected Council District(s) or citywide? Council District 9

Contract Control Number: 201631819

Vendor/Contractor Name (including any "DBA"): Concrete Works of Colorado, Inc

Type and Scope of services to be performed: This project is to improve the drainage conditions in the Lower Platte Valley, and 36th & Downing Basins (bounded by S. Platte River to East 13th Ave. and from North Williams Street to North Grant Street) during a 5-year storm event. This phase of the project is to c...

Click here for full text