File #: 17-0824    Version: 1
Type: Resolution Status: Adopted
File created: 7/18/2017 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 8/14/2017 Final action: 8/14/2017
Title: A resolution approving a proposed Contract between the City and County of Denver and Flatiron Constructors, Inc., regarding the Park Hill Storm, Phase V project. Approves a contract with Flatiron Constructors, Inc. for $7,638,647.98 and for one year for placement services of a 84" storm drainage pipe and 24" sanitary pipe from 48th Avenue and Dahlia Street to approximately 360 feet north of Smith Road and Dahlia Street including structural work, water utility relocations, sanitary sewer service reconnections, surface restoration, concrete flatwork, and asphalt paving to provide a 5-year storm system and minimize damage during storm events as part of the citywide Platte to Park Hill: Stormwater Systems project (201734065). The last regularly scheduled Council meeting within the 30-day review period is on 8-28-17. The Committee approved filing this resolution at its meeting on 7-25-17. Pursuant to Council Rule 3.7, Councilman Espinoza called out this resolution at the Monday, August 7, ...
Indexes: Zach Rothmier
Attachments: 1. RR16 0824 PW Phase V 201734065 15 Key Contract Terms, 2. RR16 0824 PW Phase V 201734065 Ordinance form, 3. P2P Council Committee_2017-07-21_Final, 4. 17-0824 Filed Resolution_Flatiron Constructors, Inc., 201734065-00, 5. 17-0824 Contract_Flatiron Constructors, Inc., 201734065-00, 6. 17-0824 Filed Resolution_Flatiron Constructors, Inc., 201734065-00.pdf, 7. 17-0824 - signed.pdf
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 07-18-11

Requesting Agency: Public Works
Division:

* Name: Angela Casias
* Phone: 720.913.8529
* Email: angela.casias@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Flatiron Constructors, Inc., regarding the Park Hill Storm, Phase V project.
Approves a contract with Flatiron Constructors, Inc. for $7,638,647.98 and for one year for placement services of a 84" storm drainage pipe and 24" sanitary pipe from 48th Avenue and Dahlia Street to approximately 360 feet north of Smith Road and Dahlia Street including structural work, water utility relocations, sanitary sewer service reconnections, surface restoration, concrete flatwork, and asphalt paving to provide a 5-year storm system and minimize damage during storm events as part of the citywide Platte to Park Hill: Stormwater Systems project (201734065). The last regularly scheduled Council meeting within the 30-day review period is on 8-28-17. The Committee approved filing this resolution at its meeting on 7-25-17. Pursuant to Council Rule 3.7, Councilman Espinoza called out this resolution at the Monday, August 7, 2017, Council meeting for a postponement to the next regularly scheduled meeting of Monday, August 14, 2017.
body

Affected Council District(s) or citywide? Citywide

Contract Control Number: 201734065

Vendor/Contractor Name (including any "DBA"): Flatiron Constructors, Inc

Type and Scope...