Denver Legistar banner



File #: 17-0956    Version: 1
Type: Resolution Status: Adopted
File created: 8/21/2017 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 9/11/2017 Final action: 9/11/2017
Title: A resolution approving a proposed Contract between the City and County of Denver and Sturgeon Electric Company, Inc., to reconstruct and upgrade for (4) existing traffic signals within the City and County of Denver. Approves a contract with Sturgeon Electric Company, Inc. for $1,516,429.56 and for seven months for the replacement and upgrade of traffic signals at the intersections of Peoria Street and 47th Avenue, Alameda Avenue and Broadway, Martin Luther King Jr Boulevard and North Monaco Parkway, and Louisiana Avenue and Downing Street, including the removal and replacement of existing signal equipment, signage, ADA compliant pedestrian ramps, curb and gutter, and upgraded sidewalks in Council Districts 5,7, and 8 (201734986). The last regularly scheduled Council meeting within the 30-day review period is on 10-2-17. The Committee approved filing this resolution by consent on 8-29-17.
Indexes: Zach Rothmier
Attachments: 1. RR17 0956 PW Sturgeon Request, 2. RR17 0956 PW Sturgeon Terms, 3. 17-0956 Filed Resolution_Sturgeon Electric Company, Inc., 201734986-00, 4. 17-0956 Contract_Sturgeon Electric Company, Inc., 201734986-00, 5. 17-0956 Contract_Sturgeon Electric Company, Inc., 201734986-00, 6. 17-0956 DO NOT USE Filed Resolution_Sturgeon Electric Company, Inc., 201734986-00.pdf, 7. 17-0956 Filed Resolution_Sturgeon Electric Company, Inc., 201734986-00.pdf.pdf, 8. 17-0956 - signed.pdf

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 08-22-17

 

Requesting Agency: Public Works

                               Division:

 

§                     Name:                     Angela Casias

§                     Phone:                     720.913.8529

§                     Email:                     angela.casias@denvergov.org

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Sturgeon Electric Company, Inc., to reconstruct and upgrade for (4) existing traffic signals within the City and County of Denver.

Approves a contract with Sturgeon Electric Company, Inc. for $1,516,429.56 and for seven months for the replacement and upgrade of traffic signals at the intersections of Peoria Street and 47th Avenue, Alameda Avenue and Broadway, Martin Luther King Jr Boulevard and North Monaco Parkway, and Louisiana Avenue and Downing Street, including the removal and replacement of existing signal equipment, signage, ADA compliant pedestrian ramps, curb and gutter, and upgraded sidewalks in Council Districts 5,7, and 8 (201734986).  The last regularly scheduled Council meeting within the 30-day review period is on 10-2-17.  The Committee approved filing this resolution by consent on 8-29-17.

body

 

Affected Council District(s) or citywide? Council Districts 5, 7 & 8

 

Contract Control Number: 201734986

 

Vendor/Contractor Name (including any “DBA”): Sturgeon Electric Company, Inc

 

Type and Scope of services to be performed: To reconstruct and upgrade four (4) existing traffic signals within the City and County of Denver. These signals are located on Monaco St Pkwy at MLK and at Alameda, Broadway at Alameda, and Peoria at 47th. The scope of work is to rebuild the traffic signals - remove/replace the existing traffic signal equipment (poles, signal and pedestrian indications, and associated equipment) with new traffic signal equipment in accordance with the City and County of Denver standards. The new traffic signal equipment includes new mast arm traffic signal poles/mast arms, multiple 12-12-12 overhead and side mounted indications, 16" pedestrian signal face, and vehicle detection system. Additional project scopes include new signing and striping packages in accordance with ASTM Type 11 retroreflective sheeting and CCD/MUTCD criteria respectively, and intersection civil reconstruction (ADA handicap ramp, curb and gutter, and sidewalk).

 

 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts): 12% M/WBE 

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment? New contract

 

Was this contractor selected by competitive process or sole source? Competitive

                     

For New contracts

Term of initial contract: Seven months

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $1,516,429.56

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)