Denver Legistar banner



File #: 18-0246    Version: 1
Type: Resolution Status: Adopted
File created: 3/5/2018 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 3/27/2018 Final action: 3/27/2018
Title: A resolution approving a proposed Contract between the City and County of Denver and Turner Construction Company for facade lighting at the Ellie Caulkins Opera House. Approves a contract with Turner Construction Company for $825,818 and for four months for the installation of new lighting systems across the exterior fa?ade of the Ellie Caulkins Opera House in Council District 9 (201737120). The last regularly scheduled Council meeting within the 30-day review period is on 4-16-18. The Committee approved filing this resolution by consent on 3-13-18.
Indexes: Zach Rothmier
Attachments: 1. RR18 0246 PW Turner Construction Ellie Caulkins Lighting Request, 2. RR18 0246 PW Turner Construction Ellie Caulkins Lighting Terms, 3. 18-0246 Filed Resolution_TurnerConstruction_201737120-00.pdf, 4. 18-0246 Contract_TurnerConstructionCo_201737120-00.pdf, 5. 18-0246 Filed Resolution_TurnerConstruction_201737120-00.pdf, 6. 18-0246 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 03-06-18

Requesting Agency: Public Works
Division:

? Name: Angela Casias
? Phone: 720.913.8529
? Email: angela.casias@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Turner Construction Company for facade lighting at the Ellie Caulkins Opera House.
Approves a contract with Turner Construction Company for $825,818 and for four months for the installation of new lighting systems across the exterior fa?ade of the Ellie Caulkins Opera House in Council District 9 (201737120). The last regularly scheduled Council meeting within the 30-day review period is on 4-16-18. The Committee approved filing this resolution by consent on 3-13-18.
body

Affected Council District(s) or citywide? Council District 9

Contract Control Number: 201737120

Vendor/Contractor Name (including any "DBA"): Turner Construction Company

Type and Scope of services to be performed:

The intent of this project is to preserve existing fixtures and install replacement fixtures where originals have been removed. An additional goal is to compliment the historic architecture and lighting. New globe sconces will be installed at original locations that will replicate the historical aesthetic while incorporating modern LED technology; column up-lights and linear up-lights on the frieze will create a rhythm of light along the facades while highlighting the capitals and detailing within the...

Click here for full text