Title: A resolution approving a proposed Contract, between the City and County of Denver and SEMA Construction, Inc. for services for the 38th and Holly Detention Pond Improvements project. Approves a contract with SEMA Construction, Inc. for $1,914,373.33 and for four months for completion of the 38th and Holly Detention Pond Improvements project including construction of a gabion drop structure to convey storm water from Holly Street into the pond, excavation of the pond, improvements to inlet and outlet structures for the addition of water quality capture volume, trail, and landscaping improvements located at 38th Street and Holly Avenue in Council District 8 (201841403-00). The last regularly scheduled Council meeting within the 30-day review period is on 8-27-18. The Committee approved filing this item at its meeting on 6-26-18.
Indexes: Zach Rothmier
Attachments: 1. RR18 0684 PW SEMA 38th and Holly Project, 2. 18-0684 Contract_SEMA Construction Inc..201841403-00, 3. 18-0684 Filed Resolution_SEMA Construction.201841403-00, 4. 18-0684 Filed Resolution_SEMA Construction.201841403-00.pdf, 5. 18-0684 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 6-19-18

Requesting Agency: Public Works
Division:

Subject Matter Expert Name:
Sarah Stanek
sarah.stanek@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract, between the City and County of Denver and SEMA Construction, Inc. for services for the 38th and Holly Detention Pond Improvements project.
Approves a contract with SEMA Construction, Inc. for $1,914,373.33 and for four months for completion of the 38th and Holly Detention Pond Improvements project including construction of a gabion drop structure to convey storm water from Holly Street into the pond, excavation of the pond, improvements to inlet and outlet structures for the addition of water quality capture volume, trail, and landscaping improvements located at 38th Street and Holly Avenue in Council District 8 (201841403-00). The last regularly scheduled Council meeting within the 30-day review period is on 8-27-18. The Committee approved filing this item at its meeting on 6-26-18.
body

Affected Council District(s) or citywide? CD 8

Contract Control Number: 201841403-00

Vendor/Contractor Name (including any "DBA"): SEMA Construction, Inc

Type and Scope of services to be performed:
This 38th & Holly Detention Pond Improvements project includes construction of a gabion drop structure to convey storm water from Holly Street into the pond It also includes excavation of the pond and improvements to inlet and outlet structures for the addit...