Denver Legistar banner



File #: 19-0213    Version: 1
Type: Resolution Status: Adopted
File created: 3/4/2019 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 3/26/2019 Final action: 3/26/2019
Title: A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. for the 2018 Citywide Bond Concrete Repair. Approves a contract with Keene Concrete Inc. for $2,468,950 and for six months to remove and replace damaged curb and gutter and non-compliant curb ramps on stretches of arterial collector streets, citywide (201845779). The last regularly scheduled Council meeting within the 30-day review period is on 4-15-19. The Committee approved filing this item at its meeting on 3-12-19.
Indexes: Zach Rothmier
Attachments: 1. RR19 0213 PW Keene.pdf, 2. 19-0213 Filed Resolution_Contract_Keene Concrete, Inc._201845779-00, 3. 19-0213 Contract_Keene Concrete, Inc._201845779-00, 4. 19-0213_Filed Resolution_Contract_Keene Concrete, Inc.pdf, 5. 19-0213 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 3-5-19

Requesting Agency: Public Works
Division:

Subject Matter Expert Name:

Name: Jason Gallardo
Email: jason.gallardo@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. for the 2018 Citywide Bond Concrete Repair.
Approves a contract with Keene Concrete Inc. for $2,468,950 and for six months to remove and replace damaged curb and gutter and non-compliant curb ramps on stretches of arterial collector streets, citywide (201845779). The last regularly scheduled Council meeting within the 30-day review period is on 4-15-19. The Committee approved filing this item at its meeting on 3-12-19.
body

Affected Council District(s) or citywide? citywide

Contract Control Number: 201815779

Vendor/Contractor Name (including any "DBA"): Keene Concrete Inc.

Type and Scope of services to be performed: Remove and replace damaged curb and gutter and curb and out of compliance curb ramps on stretches of arterial/collector streets throughout Denver.


Location (if applicable):

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):
20% W/MBE
Are WBE/MBE/DBE goals met (if applicable)?

Is the contract new/a renewal/extension or amendment?

Was this contractor selected by competitive process or sole source?
Competitive
For New contracts
Term of initial contract:...

Click here for full text