File #: 19-0252    Version: 1
Type: Resolution Status: Adopted
File created: 3/12/2019 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 4/1/2019 Final action: 4/1/2019
Title: A resolution approving and providing for the execution of a proposed Grant Agreement between the City and County of Denver and State of Colorado Department of Transportation concerning the "FY19 Federal Highway Safety Improvement Program (HSIP) Package 1" and the funding therefor. Approves a grant agreement with the Colorado Department of Transportation for $1,000,000 in Federal Highway Safety Improvement Program (HSIP) funds to reconstruct two existing traffic signals located at the North and South intersections of the Yosemite Street and Interstate 225 On/Off ramps in Council District 4 (201948441). The last regularly scheduled Council meeting within the 30-day review period is on 4-22-19. The Committee approved filing this item at its meeting on 3-19-19.
Indexes: Zach Rothmier
Attachments: 1. RR19 0252 PW CDOT HSIP 2019.pdf, 2. CR19-0252_PW_CDOT_HSIP_1_2019_Grant, 3. Grant, 4. 19-0252 PW_CDOT_HSIP_1_2019_Grant.pdf, 5. 19-0252 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 3-12-19

 

Requesting Agency: Public Works

                               Division:

 

Subject Matter Expert Name:

Name:           Jason Gallardo                    

Email:        jason.gallardo@denvergov.org  

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving and providing for the execution of a proposed Grant Agreement between the City and County of Denver and State of Colorado Department of Transportation concerning the “FY19 Federal Highway Safety Improvement Program (HSIP) Package 1” and the funding therefor.

Approves a grant agreement with the Colorado Department of Transportation for $1,000,000 in Federal Highway Safety Improvement Program (HSIP) funds to reconstruct two existing traffic signals located at the North and South intersections of the Yosemite Street and Interstate 225 On/Off ramps in Council District 4 (201948441). The last regularly scheduled Council meeting within the 30-day review period is on 4-22-19. The Committee approved filing this item at its meeting on 3-19-19.

body

 

Affected Council District(s) or citywide? CD 4

 

Contract Control Number: 201948441

 

Vendor/Contractor Name (including any “DBA”): Colorado Department of Transportation

 

Type and Scope of services to be performed:

The Federal Highway Safety Improvement Program (HSIP) funds' FY19 HSIP Pkg 1 project is to reconstruct two (2) existing traffic signals within the City and County of Denver. The two traffic signals are located at (1) Yosemite Street & I225 On/Off ramps (North Intersection); and (2) Yosemite Street & I225 On/Off ramps (South Intersection). The scope of this project will be to install new traffic signal equipment in accordance with the City and County of Denver standards. These include signal indications on every lane, 16” countdown pedestrian faces, ATC traffic controller, Ethernet switches, and UPS. ADA handicap ramp, curb and gutter, and sidewalk will also be upgraded within the impact area and installed at all locations to meet ADA and City and County of Denver standards if needed. In addition, a new raised median on the bridge deck to provide a median divided roadway to enhance safety is also included in the works. Lastly, scope of work also includes new pedestrian crosswalks and stop bars in accordance to Denver standards. 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

                     

For New contracts

Term of initial contract: Ten years

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $1,000,000

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)