File #: 19-0622    Version: 1
Type: Resolution Status: Adopted
File created: 6/24/2019 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 7/15/2019 Final action: 7/15/2019
Title: A resolution approving a proposed First Amendatory Agreement between the City and County of Denver and HYDROSYSTEMS-KDI, INC. to correct the Workers Compensation requirements for on-call irrigation planning, design, and consulting services for parks and park facilities, citywide. Amends a contract with HYDROSYSTEMS-KDI, INC. to correct the Workers Compensation requirements for on-call irrigation planning, design, and consulting services for parks and park facilities, citywide. No change in contract amount or duration (201947005). The last regularly scheduled Council meeting within the 30-day review period is on 8-5-19. The Committee approved filing this item at its meeting on 7-2-19.
Indexes: Zach Rothmier
Attachments: 1. RR19 0622 P&R HydroSystems amend, 2. 19-0622 Filed Resolution_Hydrosystems-KDI, Inc._201947005-01, 3. 19-0622 Agreement_HydroSystems-KDI, INC._201947005-201950391, 4. 19-0622 Filed Resolution_Hydrosystems-KDI, Inc._201947005-01.pdf, 5. 19-0622 - signed.pdf

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 6-24-19

 

Requesting Agency: Parks and Recreation

                               Division:

 

Subject Matter Expert Name: Laura Morales
Email Address:
Laura.Morales@denvergov.org                                                                   

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed First Amendatory Agreement between the City and County of Denver and HYDROSYSTEMS-KDI, INC. to correct the Workers Compensation requirements for on-call irrigation planning, design, and consulting services for parks and park facilities, citywide.

Amends a contract with HYDROSYSTEMS-KDI, INC. to correct the Workers Compensation requirements for on-call irrigation planning, design, and consulting services for parks and park facilities, citywide. No change in contract amount or duration (201947005). The last regularly scheduled Council meeting within the 30-day review period is on 8-5-19. The Committee approved filing this item at its meeting on 7-2-19.                                                                                                                 

body

 

Affected Council District(s) or citywide? Citywide

 

Contract Control Number: 201947005

 

Vendor/Contractor Name (including any “DBA”): HYDROSYSTEMS-KDI, INC.                     

 

Type and Scope of services to be performed:

On-call irrigation planning, design, and consulting services was executed in February 2019. The contract that was executed accidentally misclassified the vendor’s Workers Compensation requirements. The executed contract waives the WC requirement for this vendor, but in reality they have employees and do need (and do have) WC coverage.

 

Work will typically consist of (but is not limited to) assessment planning, design, and construction observation services related to parks and park facilities. Types of work may include assessment of existing park irrigation assets; design documents for repair, renovation, or replacement of existing park irrigation assets; design documents for improvements and upgrades to existing irrigation assets; system-wide planning and park-specific irrigation master planning efforts (individual park master plans, system-wide assessment reports, asset-specific planning, public engagement, and outreach); water supply infrastructure including ditch work, pump station facilities, and other delivery infrastructure; and conversion from potable to reclaimed or raw water supply.

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

Competitive process                     

For New contracts

Term of initial contract:

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term:

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)