1Contract Request Template (Contracts; IGAs; Leases)
Date Submitted: 4-10-20
Requesting Agency: Department of Transportation and Infrastructure
Division:
Subject Matter Expert Name:
Name: Jason Gallardo |
Email: jason.gallardo@denvergov.org |
Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).
Both the title and description must be entered between the red “title” and “body” below. Do not at any time delete the red “title” or “body” markers from this template.
title
A resolution approving a proposed Engineering Services Agreement between the City and County of Denver and Black & Veatch Corporation to furnish professional engineering design services to create and implement a flow monitoring plan, build a calibrated hydraulic model for both wet and dry conditions, and update the City’s 2009 Sanitary Sewer Master Plan
Approves a contract with Black and Veatch Corporation for $777,611 and for three years for a citywide Sanitary Sewer Master Plan (202053972). The last regularly scheduled Council meeting within the 30-day review period is on 5-18-20. The Committee approved filing this item at its meeting on 4-21-20.
body
Affected Council District(s) or citywide? Citywide
Contract Control Number: 202053972
Vendor/Contractor Name (including any “DBA”): Black and Veatch Corporation
Type and Scope of services to be performed:
The City and County of Denver seeks a qualified engineering consulting firm to create and implement a flow monitoring plan and build a calibrated hydraulic model for both wet and dry conditions. The project includes development of a modern Sanitary Sewer Master Plan and evaluation of existing conditions and planned future growth to recommend and prioritize improvements for the upcoming capital improvements plan.
Location (if applicable):
WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):
13%
Are WBE/MBE/DBE goals met (if applicable)?
Is the contract new/a renewal/extension or amendment?
Was this contractor selected by competitive process or sole source?
Competitive process
For New contracts
Term of initial contract: Execution + 3 years
Options for Renewal:
How many renewals (i.e. up to 2 renewals)?
Term of any renewals (i.e. 1 year each):
Cost of initial contract term: $777,611.00
Cost of any renewals:
Total contract value council is approving if all renewals exercised:
For Amendments/Renewals Extensions:
Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?
If length changing
What was the length of the term of the original contract?
What is the length of the extension/renewal?
What is the revised total term of the contract?
If cost changing
What was the original value of the entire contract prior to this proposed change?
What is the value of the proposed change?
What is the new/revised total value including change?
If terms changing
Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)