Denver Legistar banner



File #: 21-0479    Version: 1
Type: Resolution Status: Adopted
File created: 4/19/2021 In control: Business, Arts, Workforce, Climate & Aviation Services Committee
On agenda: 5/10/2021 Final action: 5/10/2021
Title: A resolution approving a proposed Contract between the City and County of Denver and Gerald H. Phipps, Inc. d/b/a GH Phipps Construction Company concerning removal and replacement of boilers and associated equipment at Denver International Airport. Approves a contract with Gerald H. Phipps Construction, Inc. doing business as G.H. Phipps Construction, Co. for $13,917,299 and for 970 days for the removal and replacement of boilers and associated equipment at Denver International Airport (202055228). The last regularly scheduled Council meeting within the 30-day review period is on 5-24-21. The Committee approved filing this item at its meeting on 4-28-21.
Indexes: John Mahoney
Attachments: 1. RR21 0479 DIA Gerald H Phipps, 2. 21-0479 Filed Resolution_GH Phipps Construction, 3. 21-0479 Contract_GH Phipps Construction, 4. 21-0479 Filed Resolution_GH Phipps Construction, 5. 21-0479 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 4-19-21

 

Requesting Agency: Denver International Airport

                               Division:

 

Subject Matter Expert Name:

Name                 Angela Casias

Email:                angela.casias@flydenver.com                                                        

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Gerald H. Phipps, Inc. d/b/a GH Phipps Construction Company concerning removal and replacement of boilers and associated equipment at Denver International Airport.

Approves a contract with Gerald H. Phipps Construction, Inc. doing business as G.H. Phipps Construction, Co. for $13,917,299 and for 970 days for the removal and replacement of boilers and associated equipment at Denver International Airport (202055228). The last regularly scheduled Council meeting within the 30-day review period is on 5-24-21. The Committee approved filing this item at its meeting on 4-28-21.

body

 

Affected Council District(s) or citywide? Council District 11

 

Contract Control Number: 202055228

 

Vendor/Contractor Name (including any “DBA”): Gerald H. Phipps Construction, Inc. (dba G.H. Phipps Construction Co.)

 

Type and Scope of services to be performed:

This project entails the removal of three boilers to be replaced with five new 20,000,000 British thermal unit (BTU) boilers as well as the following project elements within the Central Utility Plant (CUP) and Airport Office Building (AOB) and Terminal. Procure, receive, and install the following equipment: a) five hot water boilers; b) six flue chimney stacks outside the CUP at the cooling tower basin level; c) eight variable speed chilled water pumps in the AOB and the terminal, including associated 480V variable frequency drives; d) eight variable speed hot water pumps in the AOB and the terminal, including associated 480V variable frequency drives; and e) supporting electrical, instrumentation, valving, and controls equipment.

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts):

5%

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source?

Competitive process                     

For New contracts

Term of initial contract: NTP + 970 calendar days

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $13,917,299.00

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)