File #: 22-1149    Version: 1
Type: Resolution Status: Adopted
File created: 9/12/2022 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 10/3/2022 Final action: 10/3/2022
Title: A resolution approving a proposed Contract between the City and County of Denver and Hamon Infrastructure, Inc. to remove and replace the Larimer Street bridge. Approves a contract with Hamon Infrastructure, Inc. for $6,345,997.02 and 300 days to remove and replace the Larimer Street bridge over Cherry Creek and Cherry Creek trail in Council District 9, as part of the Elevate Denver Bond program (DOTI- 202263315). The last regularly scheduled Council meeting within the 30-day review period is on 10-24-2022. The Committee approved filing this item at its meeting on 9-20-2022.
Indexes: Lucas Palmisano
Attachments: 1. RR22-1149_DOTI_202263315 Ordinance Request_Hamon Infrastructure, Inc._Connecting Auraria, 2. 22-1149 Filed Resolution_Hamon Infrastructure, Inc. 202263315, 3. 22-1149 Contract_Hamon Infrastructure Inc. 202263315, 4. 22-1149 Filed Resolution_Hamon Infrastructure, Inc. 202263315, 5. 22-1149 - signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 9-19-2022

 

Requesting Agency: Department of Transportation and Infrastructure

                               Division:

 

Subject Matter Expert Name: Steve Laudeman                                                          
Email Address
:      steve.laudeman@denvergov.org                                                             
Phone Number:

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Hamon Infrastructure, Inc. to remove and replace the Larimer Street bridge.

Approves a contract with Hamon Infrastructure, Inc. for $6,345,997.02 and 300 days to remove and replace the Larimer Street bridge over Cherry Creek and Cherry Creek trail in Council District 9, as part of the Elevate Denver Bond program (DOTI- 202263315). The last regularly scheduled Council meeting within the 30-day review period is on 10-24-2022. The Committee approved filing this item at its meeting on 9-20-2022.

body

 

Affected Council District(s) or citywide? 9

 

Contract Control Number: DOTI- 202263315

 

Vendor/Contractor Name (including any “DBA”): Hamon Infrastructure, Inc.

 

Type and Scope of services to be performed:

This project is the construction phase to remove and replace the Larimer Street bridge over Cherry Creek and Cherry Creek Trail and traffic signal upgrades at the intersections of Larimer Street and NB and SB Speer Blvd. Work will include demo of the existing bridge, earthwork, construction of a new bridge.  In addition, the signal upgrades at the two intersections includes demo of the existing signal equipment, demo of the existing curb ramps, installation of upgraded signal equipment, construction of new curb ramps, and associated streetscape elements and landscaping. Traffic control and erosion control will be ongoing components of the project.

 

Location (if applicable): Over Cherry Creek on Larimer Street between Speer and 14th Street in Downtown Denver

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts): MWBE

 

Are WBE/MBE/DBE goals met (if applicable)? 20.49%

Who are the subcontractors to this contract? Rocky Mountain Signing Company 2.05%; Best Engineering 1.26%; JA Hall Industries, Inc. 2.46%; SaBell’s Civil and Landscape LLC 1.88%; Loya Construction, Inc. 12.84%

 

 

Is the contract new/a renewal/extension or amendment?

New

Was this contractor selected by competitive process or sole source?

Competitive                      

For New contracts

Term of initial contract:

NTp + 300 days

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term:

$6,345,997.02

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)