Denver Legistar banner



File #: 23-0194    Version: 1
Type: Resolution Status: Adopted
File created: 2/17/2023 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 3/20/2023 Final action: 3/20/2023
Title: A resolution approving a proposed Agreement between the City and County of Denver and Roadsafe Traffic Systems, Inc. for the citywide speed limit sign replacement project to comply with the ordinance approved as CB 21-1475. Approves a contract with Roadsafe Traffic Systems, Inc. for $1,694,825 and 487 days for the citywide speed limit sign replacement project to comply with the ordinance approved as CB 21-1475 (202263872). The last regularly scheduled Council meeting within the 30-day review period is on 4-10-2023. The Committee approved filing this item at its meeting on 3-7-2023.
Indexes: Lucas Palmisano
Attachments: 1. RR23-0194_DOTI_202263872 Ordinance Request, 2. 23-0194 Filed Resolution_RoadsafeTrafficSystemsInc_202263872-00, 3. 23-0194 Agr_RoadsafeTrafficSystemsInc_202263872-00, 4. 23-0194 Filed Resolution_RoadsafeTrafficSystemsInc_202263872-00, 5. 23-0194-Signed

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 2-27-2023

 

Requesting Agency: DOTI

                               Division:

 

Subject Matter Expert Name: Mukhtar Satar                                                             
Email Address:
Mukhtar.Satar@denvergov.org                                                             
Phone Number:

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Agreement between the City and County of Denver and Roadsafe Traffic Systems, Inc. for the citywide speed limit sign replacement project to comply with the ordinance approved as CB 21-1475.

Approves a contract with Roadsafe Traffic Systems, Inc. for $1,694,825 and 487 days for the citywide speed limit sign replacement project to comply with the ordinance approved as CB 21-1475 (202263872). The last regularly scheduled Council meeting within the 30-day review period is on 4-10-2023. The Committee approved filing this item at its meeting on 3-7-2023.

body

 

Affected Council District(s) or citywide? Citywide

 

Contract Control Number: 202263872

 

Vendor/Contractor Name (including any “DBA”): Roadsafe Traffic Systems, Inc.

 

Type and Scope of services to be performed:

Approves Contract Execution for a new hard bid construction contract with Roadsafe Traffic Systems, Inc. for Speed Limit Sign Replacement, Contract #202263872. The Speed Limit Sign Replacement Project includes installing, removing, and/or resetting speed limit signs, post mounted in both hardscape and softscape, within the City and County of Denver. This contract is a direct result of the change to Ordinance § 54-157 “Unposted speed limits”. Signs installed on local streets will be stacked “Citywide” (R2-5aP), “Speed Limit 20” (R2-1-20), and “Unless Otherwise Posted” (R2-5P). Specialty gateway signs stating “Entering the City and County of Denver. Speed Limit 20 MPH Unless Otherwise Posted” will be installed on arterial streets. All work must be completed in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and the current DOTI - Traffic Signal, Sign, and Pavement Marking Standards

 

The initial cost that was presented to Council was $1.2 million for the sign swap prior to re-estimating with the newly inflated cost of materials.

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts): No goal assigned

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

New

Was this contractor selected by competitive process or sole source?

Comp.                     

For New contracts

Term of initial contract:

NTP + 487 Days

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term:

$1,694,825

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)