Denver Legistar banner



File #: 17-0466    Version: 1
Type: Resolution Status: Adopted
File created: 4/17/2017 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 5/22/2017 Final action: 5/22/2017
Title: A resolution approving a proposed Contract between the City and County of Denver and Turner Construction Company to perform surface and architectural improvements to 13th Street, Champa Street Bridge and the DPAC parking garage. Approves a contract with Turner Construction Company for $4,794,830 and for nine months to perform surface and architectural improvements to 13th Street between Arapahoe Street and Champa Street, enhance pedestrian traffic through the Denver Performing Arts Complex (DPAC), demolish the aging Champa Street Pedestrian Bridge between the Colorado Convention Center and DPAC, and complete critical structural repairs to the DPAC Parking Garage as part of the Better Denver Bond program (201734069). The last regularly scheduled Council meeting within the 30-day review period is on 6-12-17. The Committee approved filing this resolution by consent on 5-2-17.
Indexes: Zach Rothmier
Attachments: 1. RR17 0466 PW Turner Request Terms, 2. RR17 0466 PW Turner Request, 3. 17-0466 Filed Resolution_Turner Construction Co.201734069-00, 4. 17-0466_Contract_Turner Construction Company.201734069-00, 5. 17-0466 Filed Resolution_Turner Construction Co.201734069-00.pdf, 6. 17-0466 - signed.pdf

Contract Request Template (Contracts; IGAs; Leases)

 

Date Submitted: 04-18-17

 

Requesting Agency: Public Works

                               Division:

 

§                     Name:                     Angela Casias

§                     Phone:                     720-913-8529

§                     Email:                     Angela.Casias@denvergov.org

 

Item Title & Description:

(Do not delete the following instructions)

These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney’s Office should enter the title above the description (the title should be in bold font).

 

Both the title and description must be entered between the red “title” and “body” below.  Do not at any time delete the red “title” or “body” markers from this template.

title

A resolution approving a proposed Contract between the City and County of Denver and Turner Construction Company to perform surface and architectural improvements to 13th Street, Champa Street Bridge and the DPAC parking garage.

Approves a contract with Turner Construction Company for $4,794,830 and for nine months to perform surface and architectural improvements to 13th Street between Arapahoe Street and Champa Street, enhance pedestrian traffic through the Denver Performing Arts Complex (DPAC), demolish the aging Champa Street Pedestrian Bridge between the Colorado Convention Center and DPAC, and complete critical structural repairs to the DPAC Parking Garage as part of the Better Denver Bond program (201734069). The last regularly scheduled Council meeting within the 30-day review period is on 6-12-17. The Committee approved filing this resolution by consent on 5-2-17.

body

 

Affected Council District(s) or citywide? Council District 9

 

Contract Control Number: 201734069

 

Vendor/Contractor Name (including any “DBA”): Turner Construction Company

 

Type and Scope of services to be performed: A Guaranteed Maximum Price Construction Management/General Contractor contract with Turner Construction Company to perform surface and architectural improvements to 13th Street between Arapahoe Street and Champa Street to enhance pedestrian traffic through the Denver Performing Arts Complex (DPAC), demolish the aging Champa Street Pedestrian Bridge between the Colorado Convention Center and DPAC, and complete critical structural repairs to the DPAC Parking Garage.

 

 

Location (if applicable):

 

WBE/MBE/DBE goals that were applied, if applicable (construction, design, Airport concession contracts): 12% M/WBE

 

Are WBE/MBE/DBE goals met (if applicable)?

 

Is the contract new/a renewal/extension or amendment?

 

Was this contractor selected by competitive process or sole source? Yes, an RFQ/P process was held September 2016.

                     

For New contracts

Term of initial contract: Notice to Proceed plus 275 days.

 

Options for Renewal:

                     How many renewals (i.e. up to 2 renewals)?

                     Term of any renewals (i.e. 1 year each):

 

Cost of initial contract term: $4,794,830

 

Cost of any renewals:

 

Total contract value council is approving if all renewals exercised:

 

For Amendments/Renewals Extensions:

Is this a change to cost/pricing; length of term; terms unrelated to time or price (List all that apply)?

 

If length changing

What was the length of the term of the original contract?

 

What is the length of the extension/renewal?

 

What is the revised total term of the contract?

 

If cost changing

What was the original value of the entire contract prior to this proposed change?

 

What is the value of the proposed change?

 

What is the new/revised total value including change?

 

If terms changing

Describe the change and the reason for it (i.e. compliance with state law, different way of doing business etc.)