Denver Legistar banner



File #: 19-0066    Version: 1
Type: Resolution Status: Adopted
File created: 1/22/2019 In control: Land Use, Transportation & Infrastructure Committee
On agenda: 3/18/2019 Final action: 3/18/2019
Title: A resolution approving a proposed Contract and Agreement between the City and County of Denver and Spectrum General Contractors, Inc. for Phase 3 of the Sullivan Gateway rehabilitation project. Approves a contract with Spectrum General Contractors for $1,907,325.44 and through 11-15-19 for construction renovation services as part of the Sullivan Gateway East project, including terracotta masonry restoration, repair and rehabilitation of fabricated terracotta panels and of art concrete sculptures at the top of terracotta columns, and other services, located at Colfax Avenue and Elizabeth Street in Council District 9 (201946720). The last regularly scheduled Council meeting within the 30-day review period is on 4-8-19. The Committee approved filing this item at its meeting on 1-29-19.
Indexes: Zach Rothmier
Attachments: 1. RR19 0066 PW Spectrum.pdf, 2. 19-0066 Filed Resolution_Spectrum General Contractors_201946720-00, 3. 19-0066 Contract and Agreement_Spectrum General Contractors, Inc._201946720-00, 4. 19-0066 Filed Resolution_Spectrum General Contractors_201946720-00.pdf, 5. 19-0066 - signed
Contract Request Template (Contracts; IGAs; Leases)

Date Submitted: 1-22-19

Requesting Agency: Public Works
Division:

Subject Matter Expert Name:

Name: Jason Gallardo
Email: jason.gallardo@denvergov.org

Item Title & Description:
(Do not delete the following instructions)
These appear on the Council meeting agenda. Initially, the requesting agency will enter a 2-3 sentence description. Upon bill filling, the City Attorney's Office should enter the title above the description (the title should be in bold font).

Both the title and description must be entered between the red "title" and "body" below. Do not at any time delete the red "title" or "body" markers from this template.
title
A resolution approving a proposed Contract and Agreement between the City and County of Denver and Spectrum General Contractors, Inc. for Phase 3 of the Sullivan Gateway rehabilitation project.
Approves a contract with Spectrum General Contractors for $1,907,325.44 and through 11-15-19 for construction renovation services as part of the Sullivan Gateway East project, including terracotta masonry restoration, repair and rehabilitation of fabricated terracotta panels and of art concrete sculptures at the top of terracotta columns, and other services, located at Colfax Avenue and Elizabeth Street in Council District 9 (201946720). The last regularly scheduled Council meeting within the 30-day review period is on 4-8-19. The Committee approved filing this item at its meeting on 1-29-19.
body

Affected Council District(s) or citywide? CD 9

Contract Control Number: 201946720

Vendor/Contractor Name (including any "DBA"): Spectrum General Contractors

Type and Scope of services to be performed: Project includes terracotta masonry restoration including repair of existing material and fabrication and install of newly fabricated terracotta panels, repair and rehabilitation of art concrete sculptures at the top of terracotta co...

Click here for full text